Opportunity

SAM #69056727Q000006

Geotechnical Drilling for Winchester Creek Bridge Replacement

Buyer

Western Federal Lands Highway Division

Posted

November 03, 2026

Respond By

November 17, 2026

Identifier

69056727Q000006

NAICS

238910, 541360, 541380, 541370

The Federal Highway Administration is seeking geotechnical drilling services to investigate subsurface conditions for the Winchester Creek Bridge replacement in Douglas County, Oregon. - Government buyer: Federal Highway Administration (FHWA), U.S. Department of Transportation, Western Federal Lands Highway Division (WFLHD); the U.S. Forest Service is identified as an agency partner. The categorical-exclusion document names Wendy Schmidt. - Opportunity: Solicitation 69056727Q000006, a total small-business set-aside. No OEMs, commercial vendors, or product part numbers are named. - Requested work: Two bridge-foundation borings, BH26-01 and BH26-02, generally 50–130 feet deep, with drilling, rock coring, sampling, borehole completion, and sample delivery. The boring table estimates 30 feet of auger and 80 feet of HQ core for BH26-01 (maximum depth 130 feet; 30 SPT samples) and 30 feet of auger and 20 feet of HQ core for BH26-02 (maximum depth 50 feet; 14 SPT samples). No Shelby samples are estimated in that table. - Pricing schedule: Includes mobilization, drilling/coring, pavement cores, SPT and optional Shelby sampling, suspension logging, flagging, traffic control, utility locating, site preparation, asphalt patching, sample shipping, water-level testing, and related crew/equipment costs. Amendment A001 replaces the original price-schedule page; its listed quantities are retained separately below because they differ from the original schedule and boring table. - Notable requirements: Perform P-S suspension logging in one boring through the upper 100 feet for seismic design; use traffic control and rolling closures as needed; locate and avoid utilities; patch pavement; manage and dispose of drill water and cuttings; and install flush-mounted, traffic-rated monuments in paved areas where borings are instrumented. Locations may shift up to 50 feet. The environmental document identifies a seasonal work window to avoid sensitive nesting periods. - Duration: Fieldwork is estimated at one to two weeks; the RFQ also anticipates up to six business days, while the environmental document estimates about 6–7 full days per boring. No option years are specified; an extension of services may be permitted for up to six months. - Estimated value: Approximately $30,000–$100,000; the solicitation materials provided do not state a government estimate.

Description

The Western Federal Lands Highway Division (WFLHD) of the Federal Highway Administration (FHWA) is preparing a geotechnical subsurface exploration program for the Winchester Creek Bridge in Douglas County, Oregon. The primary goal is to assess the subsurface conditions for designing a replacement bridge structure.  Agency partners include the U.S. Forest Service.

The project is located at latitude N 43.6751° and longitude W 124.1788° in the northeast ¼ of the southwest ¼ of Section 7, Township 22 South, Range 12 West of the Bureau of Land Management (BLM) Public Land Survey System (PLSS).

See attachments for full requirements.

QA 11_04_2026 Uploaded 11-04-2026

Amendment A001 Posted 11-04-2026

View original listing