Opportunity
Prince Edward Island #TOTR2026 PW-09
Garden of the Gulf Museum Accessible Washroom, Ramp, and Deck Construction
Posted
November 02, 2026
Respond By
November 19, 2026
Identifier
TOTR2026 PW-09
NAICS
236220
The Town of Three Rivers is seeking a contractor to deliver accessibility upgrades at the Garden of the Gulf Museum in Montague, Prince Edward Island. - Government buyer: Town of Three Rivers; no sub-agency or office is identified. - Scope: Build an accessible entrance ramp and viewing deck, plus an approximately 3.5 m × 3.4 m barrier-free washroom with foundation, structural, architectural, mechanical, electrical, plumbing, utility-connection, and finishing work. Also perform demolition and tie-ins, grading, walkways, site restoration, and restoration of the museum’s heritage north entrance door. - Named OEMs and equipment: Little Giant sewage ejector pump (9JF2V2D, quantity 1); Kohler lavatory (K2699-4, quantity 1) and water closet (K-3999, quantity 1); Delta faucet trim (2523 HDF); Centoco toilet seat (AM500STSCC); Bradford White water heater (PC RE1-2U6, quantity 1); Loren Cook exhaust fan (GC-126, quantity 1); Stelpro ceiling heater (DRI0221TW, quantity 1); Juno LED downlight (WF4 DREG SM AL019 SWW5 90CRI MW M6); ANPLIGHTING exterior fixture (Q-M712-E6-41); and Lithonia LED vanity light (FMVCCLS 24IN 30K35K40K 90CRI BN). The drawings also specify one CH-1 cabinet unit heater and one 40 A exterior sub-panel, with the sub-panel fed from an existing Square-D panel. Quantities for the three lighting fixtures are not stated. - Requirements: Follow the Coles Associates Ltd. drawings and specifications; comply with applicable accessibility and building-code requirements; preserve heritage features; and coordinate work to avoid disrupting nearby Home Hardware access and business. The contractor provides labour, materials, equipment, and required permits and approvals other than the building permit, which the Town obtains. - Performance and value: Construction is anticipated from spring through fall, with substantial completion expected in summer; a one-year warranty applies after substantial completion. Estimated value: $250,001–$500,000.
Description
The Town of Three Rivers is seeking quotations from qualified contractors for accessibility improvements at the Garden of the Gulf Museum in Montague, PEI. Work includes constructing an accessible entrance ramp and viewing deck, a new barrier-free washroom building with associated utility and building systems, and related demolition, tie-ins, and site work. The work also includes restoring the museum’s north entrance door while preserving its heritage character. The anticipated work period is March 1 to October 1, 2027, with substantial completion expected by July 2027.