Opportunity

New York State Contract Reporter #2140493

Tuxedo Park Water Treatment Plant clearwell and process-control upgrades

Posted

November 03, 2026

Respond By

December 09, 2026

Identifier

2140493

NAICS

237110

The Village of Tuxedo Park is seeking construction and equipment upgrades for its Water Treatment Plant clearwells and process controls. - Government buyer: Village of Tuxedo Park, Administration Division, Tuxedo Park, Orange County, New York. - Scope: Install 12 geomembrane baffles across two clearwell basins (six per basin), perform crack repairs, replace existing 8-inch valves, and upgrade process controls. - Equipment: Furnish and install one ultrasonic flow meter with a remotely located transmitter, and one chlorine feed pump and control station with flow-paced speed control. - Bid Alternate 1: Replace two vertical-turbine backwash pumps and two motors in kind. OEM: Goulds, Model VIT-FUFM 12FRHO; motors are 40 HP, 1800 RPM, vertical hollow-shaft units. - Notable requirements: Complete clearwell work one basin at a time and maintain required flows, flow metering, and level controls during construction. Existing clearwell level transducer and chlorine residual analyzer remain in place, with control logic updated. - Named firms: Goulds is the specified pump OEM; Weston & Sampson Engineers, Inc. is identified as the engineer.

Description

The project upgrades the Village of Tuxedo Park Water Treatment Plant clearwells. Work includes installing baffles in two clear wells, one at a time, and making crack repairs and control modifications. The plans also describe upgrades to process controls and related equipment. A bid alternate covers replacing two existing vertical turbine backwash pumps and motors in kind; the contract term is 180 days for substantial completion.

View original listing