Opportunity

South Carolina Business Opportunities #65719

Saluda Shoals Park entrance, concrete pad, conduit, and median renovations

Posted

May 12, 2026

Respond By

May 21, 2026

Identifier

65719

NAICS

238110, 238210, 238910, 237310

Irmo Chapin Recreation Commission is seeking a contractor for entrance and median renovations at Saluda Shoals Park in Columbia, South Carolina. - Buyer: Irmo Chapin Recreation Commission; Administration Office. The attachment identifies Jay Downs as the contact. - Work requested: Provide labor, equipment, and materials to build concrete kiosk and gate-arm pads, install data and electrical conduits, construct raised-curb medians, and remove and properly dispose of construction waste. - Scope by location: - West Side Entry Gate: Two 2-by-4-foot kiosk pads and approximately 25 feet of conduit per pad. - East Side Upper Entry Gate: One kiosk pad, one gate-arm pad, a 390-square-foot median with a 6-inch curb, and approximately 100 feet of conduit. - East Side Upper Parking Lot Exit: Two gate-arm pads and approximately 30 feet of conduit per pad. - East Side Lower Entry Gate: Two kiosk pads, one gate-arm pad, two 2-by-14-foot medians with 6-inch curbs, and conduit runs of approximately 30 and 60 feet. - Pad specifications: Concrete pads are 2 by 4 feet, extending 12 inches below grade and 6 inches above grade. Conduit is to be elbowed into the boxes and routed as specified for each location. - Other requirements: Properly dispose of generated waste, including old asphalt, concrete, and equipment cleanings. Required qualifications include applicable hazardous-material abatement and disposal licenses or certifications. - OEMs and vendors: No product manufacturers, OEMs, or prospective vendors are named. No branded products or part numbers are specified.

Description

The Irmo Chapin Recreation Commission requests bids for entrance renovations at Saluda Shoals Park, including roadway kiosk pads and medians. The work includes concrete kiosk and gate-arm pads, data and electrical conduits, and construction of medians at specified park entrances and parking lot exits. The contractor must provide labor, equipment, and materials and remove and properly dispose of generated waste. Bid components may be awarded separately, and bidders must submit insurance documentation, a bid bond or certified check of at least 5%, references, and a proposed work schedule.

View original listing