Opportunity

Massachusetts COMMBUYS #BD-27-1432-ARLTN-ARLTN-134198

Chestnut Manor vestibule, entry-door, building-systems, and accessibility upgrades

Posted

October 29, 2026

Respond By

November 13, 2026

Identifier

BD-27-1432-ARLTN-ARLTN-134198

NAICS

236220, 238210, 238220, 238290, 238990

The Arlington Housing Authority is seeking a construction contractor to upgrade an entry at Chestnut Manor in Arlington, Massachusetts. - Government buyer: Arlington Housing Authority; the materials do not identify a sub-agency or office. - Project: Add a vestibule inside the community room at Chestnut Manor (667-2), a state-aided development. - Requested work: Build a storefront across three openings, including two power-operated entry doors; install interior partitions, finishes, ceiling systems, walk-off carpet tile, cabinetry, woodwork, and a counter; and provide vestibule HVAC equipment. - Building systems: Modify and expand the intercom, security, fire-alarm, and access-control systems, including a new NVR system; provide electrical work and interior and exterior lighting. - Site accessibility: Construct an accessible concrete walkway and landing with curbing, paved walkways, and metal railings. - OEMs and named organizations: No product manufacturers or OEMs are identified. REVERSE ARCHITECTURE prepared the project documents, and Nashoba Blue Inc. is named as a place to view hard-copy documents; neither is identified as a product manufacturer. - Quantity and estimated cost: One construction project; estimated project cost is $325,000. No product part numbers are provided. - Notable requirements: The work includes accessible pedestrian routes and coordination of several existing building systems with new vestibule construction.

Description

The Arlington Housing Authority seeks bids for an entry door upgrade at Chestnut Manor (667-2) in Arlington, Massachusetts. The project includes adding a vestibule at the community room’s existing rear entrance, with storefront openings and power-operated entry doors, partitions, finishes, cabinetry, HVAC, and modifications to intercom, security, fire alarm, access control, and electrical systems. Site work includes an accessible concrete walkway, paving, and metal railings. The estimated project cost is $325,000; general bids are due November 13, 2026, and filed sub-bids are due October 29, 2026.

View original listing