Opportunity
Lynwood Planet bids #2026-4
CDBG Alley Resurfacing and Infrastructure Improvements in Lynwood
Posted
October 29, 2026
Respond By
December 02, 2026
Identifier
2026-4
NAICS
237310, 237990
The City of Lynwood Public Works Department is seeking a contractor for CDBG-funded alley improvements across several Lynwood alleys. - Government buyer: City of Lynwood, Public Works Department. - Project scope: Resurfacing and reconstruction work in Alleys 62, 64, 45, 116, 90, 44, and 43, including pavement removal and paving, concrete intersections and gutters, sidewalks, driveway approaches and ramps, curbs, drainage-related work, utility adjustments, signs, and site restoration. - Key quantities and specifications: 14,832 SF of 2-inch asphalt milling; 1,015 CY of crushed aggregate base; 751 tons of 2.5-inch Type B-PG 64-10 asphalt concrete base; and 451 tons of 1.5-inch plus 138 tons of 2-inch Type C2-PG 64-16 ARHM overlay. The scope also includes 13,309 SF of concrete longitudinal gutter and 2,699 SF of concrete alley intersections. See line items for the complete quantities. - OEMs and named firms: No product OEMs or branded products are specified. Prospective bidders named are Calmex Engineering, Inc.; Copp Contracting, Inc.; Pavement Recycling Systems; Rojas Construction; TVR Construction Engineering LLC; and Vido Samarzich, Inc. Bowman is identified as the supervising engineering firm. - Notable project requirements: Work includes detectable warning surfaces, sod and redwood headers, adjustment or replacement of water-meter boxes and covers, adjustment of water-valve cans and covers, and adjustment of storm-drain, sewer, or utility manhole frames and covers. The project also includes traffic control, construction survey and staking, and material testing as directed by the Engineer.
Description
The City of Lynwood is soliciting bids for alley improvements under the CDBG Alley Improvement Project. Work includes street resurfacing and partial replacement of concrete sidewalks, curb and gutters, driveway approaches, and curb ramps, along with traffic signing and striping improvements. The work covers designated alleys and is further defined in the Contract Documents and construction plans. A mandatory pre-bid meeting is scheduled for November 5, 2026.