Opportunity

North Texas Tollway Authority Marketplace #B2600001099

NTTA roadway restriping and delineator work on the Dallas North Tollway and Lewisville Lake Toll Bridge

Posted

October 30, 2026

Respond By

November 19, 2026

Identifier

B2600001099

NAICS

237310

The North Texas Tollway Authority is seeking a contractor to restripe portions of the Dallas North Tollway and Lewisville Lake Toll Bridge. - Government buyer: North Texas Tollway Authority (NTTA), Procurement Services; Project Delivery – Construction & Operations. The attached vendor-response guide identifies the Procurement Department. - Work area: Dallas North Tollway Segment 03, from President George Bush Turnpike to Sam Rayburn Tollway, and Lewisville Lake Toll Bridge, from Swisher Road to West Eldorado Parkway, in Collin and Denton Counties; approximately 39,680 feet (7.52 miles). - Requested work: Remove existing markings and markers, prepare pavement surfaces, install new 100-mil thermoplastic and all-weather pavement markings, pavement markers, delineators, and rumble strips, and provide traffic control. The bid schedule includes roadway signs, pavement sealing, arrows, words, shields, and gore markings. - Named OEMs/products: Hilti KH-EZ 3/8-inch by 4-inch screw-anchor system (reference 418059) and City Post 36-inch white surface-mount delineator post with two white abrasion-resistant AR 1000 reflective wraps. Quantities for these specifically described products are not stated. - Schedule quantities: The detailed line items include, among others, 269,180 of 12-inch pavement sealer, 92,217 of listed white 100-mil reflectorized pavement markings, and 269,180 of 6-inch pavement-surface preparation. See the line-item lists for all quantities. - Notable requirements: Completion is specified within 150 calendar days from Notice to Proceed or start of time charges, with a two-year warranty after final acceptance. The solicitation states a 10% small-business subcontracting goal. - Scope note: One attached response-guide summary also describes an NTTA budgeting tool for Finance. That item appears unrelated to the roadway construction scope and is listed separately below to preserve the attachment information.

Description

The North Texas Tollway Authority is seeking bids to remove and replace pavement markings on the mainlanes, ramps, and direct connectors of the Dallas North Tollway from PGBT to SRT and at the Lewisville Lake Toll Bridge. Work includes applying 100 mil thermoplastic pavement markings and installing delineators. The procurement documents state a contract term of five months and a 10% small business goal. The estimated project value is $1,000,000 to $5,000,000.

View original listing