Opportunity

E-Rate #270002388

Turnkey OS2 Fiber Cabling Installation for Fredon Township School

Posted

October 29, 2026

Respond By

November 26, 2026

Identifier

270002388

NAICS

238210

Fredon Township School District is seeking a turnkey installation of new fiber connections at Fredon Township School. - Buyer: Fredon Township School District, Newton, New Jersey; the work is at Fredon Township School. - Requested work: Install approximately three 12-strand OS2 single-mode fiber runs connecting Room 15 to the main office, the main office to Room 38, and Room 38 to Room 50. Final lengths and project details are to be determined during the walkthrough. - Termination and deliverables: Terminate six strands at each end of each run and protect the other six strands for future use. Include project management, materials, testing, labeling, documentation, and post-installation surveys. - BOM components: Four 12-fiber LC UPC patch panels or enclosures; 36 LC UPC terminations; 12 OS2 LC-LC duplex patch cords; eight 10G SFP+ modules (UACC-OM-SM-10G-D); three 10G direct-attach cables (UACC-DAC-SFP10); 18 LC UPC adapters or couplers; and any needed fiber-management accessories and additional components. Conduit, cable supports, and pathway materials are also required as needed. - OEMs and vendors: No manufacturer preference or named vendor is specified. The UACC part numbers may indicate Ubiquiti-compatible products, but the documents do not identify Ubiquiti as the required OEM; equivalent products are allowed. - Pricing and requirements: Provide regular-hours and after-hours pricing if possible. Labor must comply with New Jersey prevailing-wage law. A mandatory walkthrough is required; footage and additional components will be confirmed there. - Additional listing: The FCC Form 470 separately lists 1,000 feet of cabling and 500 units each of antennas, connectors, and related components. These broad listing quantities should be reconciled against the detailed fiber scope.

Description

Fredon Township School District is seeking proposals for Category 2 fiber cabling work at Fredon Township School. The project calls for labor and materials to install and test approximately three 12-strand OS2 single-mode fiber runs, with six strands terminated at each end of each cable. Proposals should cover a turnkey solution, including labor, materials, project management, testing, labeling, documentation, and post-installation surveys. A mandatory walkthrough is scheduled for November 13, 2026, and vendors must attend to submit a proposal; bids are due by November 30, 2026, at 11:59 p.m. EST.

View original listing