Opportunity

Saskatchewan Tenders #RM4-2027-01

Gravel incorporation and shaping for 6.5 miles of municipal roads

Posted

October 28, 2026

Respond By

November 26, 2026

Identifier

RM4-2027-01

NAICS

237310

The Rural Municipality of Coalfields No. 4 is seeking a contractor to improve 6.5 miles of gravel roads in Divisions 2 and 3. - Government buyer: Rural Municipality of Coalfields No. 4; Manager of Public Works. - Scope and quantities: - Incorporate 700 yards per mile of 1-inch gravel into the roadway, approximately 4,550 yards total. - Apply 250 yards per mile of Type 106 gravel as the finished surface, approximately 1,625 yards total. - Pull up shoulders; grade and compact the road; shape and smooth side slopes, ditches, and back slopes; maintain approaches; and remove rocks 80 mm or larger. - Contractor supplies, loads, and hauls the gravel. Additional gravel may be required in deficient areas, and water for dust control or compaction may be needed at contractor expense. - Road requirements: 8-metre width, 2% crown, and 4:1 side slopes. - Schedule and delivery: Work is planned for 2027, with the schedule avoiding seeding and harvest periods. Completion is required by October 2027; late completion incurs a $500-per-day penalty. - Other requirements: Proposals are to include an equipment list and references from at least two municipalities. The contractor must provide public-safety signage, protect utilities, and carry at least $2 million in general liability and property damage insurance. - OEMs and vendors: No manufacturers, OEMs, or vendors are named.

Description

The Rural Municipality of Coalfields No. 4 is seeking proposals for gravel incorporation and roadway shaping on 6.5 miles of road in Division 2 and 3. Work includes pulling up road shoulders, incorporating gravel, grading and packing the roadway, applying a Type 106 gravel finish, and removing rocks 80 mm or larger. The contractor is responsible for supplying, loading, and hauling gravel, along with mobilization and other job costs. Proposals must include equipment, references, and a proposed 2027 schedule; the project must be completed by October 1, 2027.

View original listing