Opportunity
CanadaBuys #SK-HWY-H26125-APPN
Highway 41 culvert replacement and erosion-control work near Wakaw
Posted
October 28, 2026
Respond By
November 12, 2026
Identifier
SK-HWY-H26125-APPN
NAICS
237310, 237990
The Government of Saskatchewan is planning a Highway 41 culvert replacement and erosion-control project near Wakaw. - Government buyer: Government of Saskatchewan, through SaskBuilds and Procurement and the Ministry of Highways. - Scope: Supply and install one smooth-wall steel pipe culvert beneath the roadway by boring, plus associated site restoration and erosion-control work. - Key items and estimated quantities: - One 750 mm diameter, 40 m long culvert with 12.7 mm wall thickness. - 35 m³ each of Random Riprap Type I and Type II; 150 m of silt fence. - 900 m² of erosion-control blanket and 900 m² of seeding. - 250 m³ of borrow material and 15 m³ of topsoil. - Geotextiles and culvert markers; quantities are not specified. - OEMs and vendors: No OEMs, product brands, or commercial vendors are identified in the notice. - Important qualification: Quantities and project details are preliminary.
Description
This advance proposed procurement notice concerns a contractor to replace a culvert on Highway 41, approximately 8.2 km southwest of its junction with Highway 2 near Wakaw, Saskatchewan. The work is to supply and install one 750 mm diameter, 40 m smooth wall steel pipe culvert using the boring method. Associated work includes supplying borrow material, topsoil, geotextiles, riprap, culvert markers, seeding, and erosion-control materials; estimated quantities are subject to change. Work may begin as early as November 2026, with completion as early as February 28, 2027, and the Ministry of Highways reserves the right not to proceed with advertising the work.