Eatonton CDBG sanitary sewer and storm drain improvements
Posted
October 28, 2026
Respond By
December 02, 2026
Identifier
PE-66456-NONST-2027-000000010
NAICS
237990, 237110, 237310
The City of Eatonton is seeking bids for CDBG-funded sanitary sewer and storm drain improvements in Eatonton, Georgia. - Government buyer: City of Eatonton, Putnam County, Georgia. - Scope: Build storm drainage infrastructure and restore affected streets and properties. - Install 1,832 LF of 18-inch, 62 LF of 24-inch, 53 LF of 36-inch, and 42 LF of 48-inch reinforced concrete pipe (RCP). - Install 31 storm drainage structures, 6 one-foot-by-one-foot yard inlets, and 2 conflict/junction boxes. - Construct 6,548 LF of concrete curb and gutter. - Address 10 utility service conflicts and provide required appurtenances. - Replace 398 SY of concrete driveway and remove and replace 512 SY of Class A concrete. - Perform pavement patching, leveling, and resurfacing with approximately 309 tons of recycled asphalt concrete leveling and 600 tons of 9.5 mm Superpave asphalt; include striping, erosion control, grading and clearing in the drainage easement, and traffic control. - OEMs and vendors: No product manufacturers, OEMs, or vendors are named in the provided information. The City of Eatonton is the buyer. - Notable requirements: Applicable Build America, Buy America requirements apply. Section 3 business concerns are encouraged to participate, and Section 3 documentation is required before award. - Schedule: Complete the work within 180 consecutive calendar days after the notice to proceed.
Description
The project involves construction of storm drainage infrastructure, including approximately 1,832 LF of 18-inch RCP pipe, additional RCP pipe in 24-, 36-, and 48-inch diameters, and 31 drainage structures. Related work includes curb and gutter, driveway and concrete replacement, asphalt leveling and resurfacing, striping, erosion control, grading and clearing, and traffic control. The advertisement identifies the project as “2025 CDBG: Sanitary Sewer System & Storm Drain Improvements” and states that work must be completed within 180 consecutive calendar days after the notice to proceed. Section 3 documents are required before Notice of Award, and applicable Build America, Buy America requirements must be followed.