Opportunity

Port of San Diego PlanetBids #2025-22

Electrical retrofit of the San Diego Bayfront Parking Structure

Posted

October 27, 2026

Respond By

December 01, 2026

Identifier

2025-22

NAICS

238210

The San Diego Unified Port District is seeking a contractor to retrofit lighting and electrical systems at its Bayfront Parking Structure while keeping the facility open to the public. - Government buyer: San Diego Unified Port District, Procurement Services Department; Port Maintenance personnel will receive training. - Scope and phasing: Base bid covers the first and seventh floors and all stairwells; additive schedules cover floors two through six. At least 80% of the floor under construction must remain open, and no floor may be completely closed. - Products requested: LED lighting fixtures and poles, lighting controls, electrical distribution equipment, 600V THWN-2 wire, RMC conduit, grounding components, electrical and communications pullboxes/enclosures, and electrical-system supports and identification. No OEM, manufacturer, model, or part number is specified. - Construction services: Demolition and removals, core drilling, installation, traffic control and construction-area signs, safety and BMP planning, electrical testing and commissioning, illumination-level verification, staff training, record drawings, and closeout. The base bid includes a $60,000 related-work allowance. - Notable requirements: Maintain fire lanes, emergency access, pedestrian routes, and continuous ADA parking access. A California A, B, and/or C-10 contractor license is required. The stated project estimate is $900,000, and the contract duration is 180 calendar days. - Named organizations: San Diego Unified Port District and its Procurement Services Department. No commercial OEM, manufacturer, or selected vendor is identified.

Description

The solicitation seeks a contractor to complete the electrical retrofit of the Bayfront Parking Structure at 1 Park Blvd in San Diego. Work includes furnishing labor, materials, equipment, transportation, and disposal, and installing light fixture retrofits and light poles, electrical distribution equipment, wiring, cable, and conduits. The scope also includes demolition of replaced fixtures, testing and commissioning, safety and traffic controls, and coordination to keep the parking structure in use during phased construction. Work is described in Plans Drawing No. EM-2025-06 and Specifications No. 2025-22, with a 180-calendar-day contract duration.

View original listing