Opportunity
Walton County Opengov #05-27
DeFuniak Springs Courthouse Concealed Gutter System Replacement
Posted
October 27, 2026
Respond By
November 19, 2026
Identifier
05-27
NAICS
238190
Walton County is seeking a complete concealed-gutter replacement for the three-story DeFuniak Springs Courthouse in Florida. - Government buyer: Walton County, through Walton County Purchasing; the initial notice identifies Facility Maintenance. - Scope of work: Remove and replace the existing internal/concealed gutter system, including gutter components, liners, flashing, outlets, connections, drainage components, waterproofing, and restoration. - Contractor responsibilities: Provide labor, materials, equipment, access systems, permits, disposal, safety controls, temporary weather protection, inspection, testing, and closeout documentation. - OEMs and vendors: No manufacturer, OEM, or contractor is named. The contractor must identify its proposed manufacturer, gutter material, product specifications, finish, and installation method. - Quantities and part numbers: None specified; contractors must assess site conditions and quantities. - Notable requirements: Protect the courthouse’s architectural features and the public, maintain weather protection and drainage during work, and provide at least a one-year workmanship warranty. Quotes should include a lump-sum price with an itemized breakdown, proposed schedule, and licensing information.
Description
Walton County is requesting competitive quotations from qualified, licensed, and insured contractors to remove and replace the complete existing internal/concealed gutter system at the three-story DeFuniak Springs Courthouse. The work includes associated gutter components, liners, flashing, outlets, drainage connections, installation, waterproofing, and restoration needed to provide a complete, watertight system. Contractors must assess site conditions and quantities, provide required labor, materials, equipment, access systems, safety controls, permits, disposal, and submit a lump-sum quotation with an itemized cost breakdown. The quote is due November 19, 2026, at 12:00 p.m. Central Time, and must be submitted electronically through OpenGov.