Opportunity

City of Bluffs Ionwave #PURCH - 2026 - 63 Addendum 1

Construction of a Dry-Material Storage Building at the Council Bluffs Recreation Complex

Posted

October 15, 2026

Respond By

November 06, 2026

Identifier

PURCH - 2026 - 63 Addendum 1

NAICS

236220

The City of Council Bluffs is seeking a contractor to build a dry-material storage building at the Council Bluffs Recreation Complex. - Government buyer: City of Council Bluffs, Purchasing office, Council Bluffs, Iowa. - Procurement: Recreation Complex Storage Building Rebid, Project R27-03; one all-or-nothing, lump-sum construction contract. - Base-bid work: Build a non-conditioned storage building on the existing Phase I foundation and floor slab. Work includes reinforced CMU walls and piers, masonry connections and sealants, caps and water-repellent treatment, roof framing and standing-seam metal roofing, gutters and downspouts, doors, bollards, structural steel at designated openings, and related labor and materials. Existing footings and slab are excluded except for required connections or modifications. - Specified components: Three insulated steel overhead doors and eight galvanized steel pipe bollards. The building also includes an insulated hollow-metal personnel door, frame, and hardware; quantities are not specified. - Optional alternates: Substitute matching painted-green steel bollards; substitute matching precast concrete or cast-stone pier caps; and provide four 8-inch-square smooth green glazed accent CMU units at the piers. - OEMs and vendors: No manufacturers, OEMs, or commercial vendors are named; no part numbers are provided. - Notable requirements: Complete the work by the solicitation's stated deadline. The bidder must provide bid security, and the successful contractor must provide performance and payment bonds, insurance, and required compliance certifications.

Description

The City of Council Bluffs requests bids to construct a non-conditioned dry material storage building on the existing Phase I concrete foundation and floor slab. The work includes CMU walls and piers, roofing and framing, doors, bollards, structural steel, and related materials, labor, and equipment; specified connections and modifications to the existing foundation and slab are included where indicated in the Contract Documents. Three optional alternates cover bollards, pier caps, and accent block. Bids are electronic through IonWave, awarded all-or-nothing to one contractor based on the lump-sum base bid, and all work must be completed by December 31, 2027.

View original listing