Opportunity
Massachusetts COMMBUYS #BD-27-1348-DPW34-131-134850
Route 9 Water Main Rehabilitation—Phase I
Posted
October 28, 2026
Respond By
November 19, 2026
Identifier
BD-27-1348-DPW34-131-134850
NAICS
237110, 562910
The Town of Westborough is seeking a contractor to rehabilitate a section of the Route 9 water main in Massachusetts. - Government buyer: Town of Westborough, Department of Public Works. - Scope: Line approximately 950 feet of existing 8-inch asbestos-concrete (AC) water main and install approximately 270 feet of new 8-inch ductile iron water main. Work covers Route 9 and Otis Street. - Additional work: Replace gate valves and hydrant assemblies within the project limits, provide temporary bypass piping, and remove and legally dispose of demolished AC pipe and asbestos-contaminated material. - Products and quantities: Approximately 950 feet of structural liner; approximately 270 feet of 8-inch ductile iron pipe; gate valves and hydrant assemblies, with quantities unspecified. No part numbers are provided. - OEMs and vendors: No manufacturers, OEMs, or vendors are named in the solicitation materials. - Notable requirements: The work involves asbestos-containing pipe and contaminated material, requiring removal and legal disposal. The attachment identifies an estimated project value of $474,130. - Performance period: Construction is planned for spring 2027, with an approximately eight-week work window. No option years or annual subscription are stated.
Description
The Town of Westborough is seeking bids for rehabilitation of the Route 9 water main. Work includes installing a structural liner in approximately 950 feet of existing 8-inch asbestos-concrete water main and installing approximately 270 feet of 8-inch ductile iron water main. The work also includes replacing valves and hydrant assemblies, removing and legally disposing of demolished asbestos-concrete pipe and asbestos-contaminated material, and providing temporary bypass piping. Excavation must begin no earlier than April 1, 2027, and be completed by May 27, 2027; contractor prequalification in the MassDOT Sewer and Water class is required.