Opportunity

Johnson County Ionwave #FAC-2026-R01 Addendum 1

Manual solar roller shade supply and installation at two Johnson County facilities

Posted

October 15, 2026

Respond By

November 06, 2026

Identifier

FAC-2026-R01 Addendum 1

NAICS

238390, 337920

Johnson County Government is seeking a contractor for manual solar roller shades at two county facilities, coordinated with a related glazing replacement project. - Buyer and locations: Johnson County Government, Facilities Management, with Johnson County Sheriff Operations (SHR) involvement; the work is at the Sheriff Operations Building and New Century Adult Detention Center (NCADC) in New Century, Kansas. - Shade OEM and basis of design: SWP Pro Series Manual Solar Shade, Crosshatch S300 (3%), Steel Gray, with clear-anodized front fascia. No quantities, final measurements, or part numbers are provided; drawings show approximate sizes and locations. Single, dual, and coupled configurations are specified. - Shade work: One lump-sum base bid for labor, materials, equipment, and services. Remove existing window treatments, protect salvaged roller shades for the Owner, legally dispose of horizontal blinds and debris, install new shades as window areas become available, and clean work areas. NCADC work is Add Alternate #1. - Coordination and site requirements: Coordinate with Janssen Glass, furniture movers, and the County representative, including Rick Gehlbach. Work is expected to proceed progressively, with weekly site visits as areas are ready. Personnel working at sheriff facilities must clear background checks before access; fingerprinting may be required. Work hours are generally 7:00 a.m.–3:30 p.m. on weekdays, excluding County holidays, and workers must wear green or yellow high-visibility clothing on the torso. - Related glazing-plan products and named manufacturers: The project drawings also specify storefront systems from Tubelite or Manko Window Systems, Inc.; glass options from Vitro or Viracon; Mullion Mate partition closures by Gordon Interior Specialties Division, Gordon, Inc.; and CCW MiraDRI 860/861 waterproofing by Carlisle Coatings & Waterproofing. The drawings also describe aluminum entrance doors and associated glazing; quantities are not stated. - Other named organizations: Finkle + Williams Architecture is identified as the project designer. The related glazing work includes salvaging and reinstalling existing maglocks and automatic operators where indicated. - Schedule: The construction phase is described as running from November 2026 through mid-June 2027. Another attachment gives an inconsistent substantial-completion year; the schedule discrepancy is not resolved in the provided material.

Description

The project procures labor and materials to remove existing window treatments as needed and install new manual roller shades at the Sheriff Operations Building and New Century Adult Detention Center in coordination with a separate glazing replacement project. The contractor must coordinate installation with the glazing contractor and furniture movers, protect removed roller shades for owner salvage, dispose of horizontal blinds and debris, and clean the work area. Work is expected from November 2026 through June 15, 2027, with installation occurring as window areas become available. Contractors performing work at sheriff facilities must complete and clear background checks before access.

View original listing