Opportunity
New York State Contract Reporter #2140346
OPWDD Marshall Road IRA Accessible Bathroom Renovation
Posted
October 28, 2026
Respond By
December 01, 2026
Identifier
2140346
NAICS
236118, 238220, 238210, 238390
OPWDD is seeking a contractor to demolish and rebuild an accessible bathroom at its Marshall Road IRA in Waterloo, New York. - Government buyer: New York State Office for People With Developmental Disabilities (OPWDD), Finger Lakes Developmental Disabilities Service Office (Finger Lakes DDSO), including its Capital Services and Business Office functions. - Requested work: One bathroom renovation, including demolition and reconstruction, accessible fixtures, plumbing and electrical modifications, finishes, inspections, debris removal, and cleanup. The residence remains occupied, so work must be coordinated to protect residents and staff and maintain safe access and building systems. - Specified products and quantities: One each of the Delta T13H153 shower fixture, Sloan WETS 8009.8010-STG accessible toilet, Sioux Chief Series 822 floor drain, Neodrain linear shower drain, Kohler K2035-4-0 wall-mounted sink, Progress Lighting P2991-15 vanity light, NDR Razor R CCT 6 downlight, Bobrick B290 1830 mirror, Bobrick B-667 toilet tissue dispenser, and Hampton 30 x 12 x 42-inch wall cabinet. Grab bars: one each of Bobrick B-6806X18 (18-inch), B-6803X24 (24-inch), and B-6806X42 (42-inch), plus two each of B-6806X36 (36-inch) and B-6806X48 (48-inch). Additional specified materials include Daltile Stepwise Calgary CG40 Legacy Straight Joint 2x2 floor tile and Sherwin-Williams ProIndustrial PreCatalyzed Watershed Epoxy Semi Gloss K46 Series paint; quantities are not specified. Solid-surface shower wall panels and two layers of 5/8-inch moisture-, mold-, and fire-resistant ceiling gypsum board are also required, with quantities not specified. Equivalent products are allowed where indicated in the specifications. - Other named organizations and vendors: Lozier Environmental Consulting, Inc. conducted a pre-renovation asbestos survey; the provided survey found sampled materials to be non-asbestos-containing. EMSL Analytical and HUQ Engineering Consultancy are also named in the opportunity materials. Sherwin-Williams and Oatey are referenced in the initial project materials. These organizations are not identified as required bidders. - Notable requirements: Work must comply with applicable codes and New York prevailing-wage requirements. The specifications call for staged and final inspections, required plumbing and shower testing, and at least a one-year warranty for parts, materials, and labor. A mandatory site visit is required, and the contractor must provide the required New York State Department of Labor registration documentation with its bid. - Timing: Work must begin within 120 days after receipt of the purchase order and continue without interruption through completion. The stated contract term is 30 days after project completion.
Description
The Finger Lakes DDSO is soliciting bids to remove and replace the bathroom at the Marshall Rd IRA, 1519 Marshall Rd, Waterloo, NY 13165, in accordance with the provided scope and design documents. The work includes demolition and reconstruction, including flooring, plumbing rough-in, fixtures, and related work; the residence will remain occupied, and work must be coordinated to maintain safety and accessibility. A mandatory site visit is scheduled for November 19, 2026, at 10:00 AM, and bidders must attend the entire visit. This is a New York State public works project requiring prevailing wages; bidders must provide a valid NYSDOL registration number and Certificate of Registration with their bid.