Opportunity
City of Columbia Ionwave #6/2027
Replacement and installation of a 130 kW-or-greater natural-gas emergency generator
Posted
October 26, 2026
Respond By
November 17, 2026
Identifier
6/2027
NAICS
238210
The City of Columbia is seeking a new natural-gas emergency generator and a complete installation for its Utilities Department power plant. - Government buyer: City of Columbia, Missouri — Utilities Department; Purchasing Division. - Procurement: Replace the existing 130 kW emergency generator at the power plant with one new generator. The existing unit is identified as a Generac QT13068ANAY; the solicitation does not specify an OEM or part number for the replacement unit. - Minimum generator requirements: At least 130 kW; natural gas; 240/120 V; single-phase; 60 Hz; new, current-production equipment listed for emergency standby service. - Installation and commissioning: Deliver and install the generator, including labor, materials, equipment, permits, startup, testing, and commissioning. Provide operator training and operating, maintenance, and warranty documentation before acceptance. The City handles removal and disposal of the existing generator and any required concrete modifications. - Warranty and contract requirements: Minimum two-year generator warranty; Missouri prevailing-wage requirements apply, and the sample contract includes performance-bond and labor-and-material-payment-bond provisions. - Scope and timing: Contract work runs from the effective date or Notice to Proceed through project completion; the completion duration is not specified in the available documents.
Description
The City of Columbia is requesting competitive bids for an emergency generator for the City’s power plant. The procurement includes replacement of the power plant emergency generator, with project scope and technical specifications set out in the bid documents. Responses may be submitted electronically or as sealed hard-copy bids. The contract period is from the effective date through completion of the project.