Opportunity

East Bay Municipal Utility District Ebmud #FMC733-26-02

Stott Reservoir joint-sealant replacement and protective-coating work

Posted

October 27, 2026

Respond By

November 24, 2026

Identifier

FMC733-26-02

NAICS

238190, 562910

East Bay Municipal Utility District’s Maintenance Support East office seeks a contractor for joint-sealant and protective-coating work at Stott Reservoir in Oakland, California. - Buyer: East Bay Municipal Utility District (EBMUD), Maintenance Support East. - Scope: Remove and replace approximately 1,180 linear feet of joint sealant, including joint preparation and primer application; abrasive-blast the overflow pipe, ladder, hatch, and other designated surfaces; and apply protective coating. - Specified OEM products: Sika Sikaflex 2c-NS two-component polyurethane sealant and Sika 62 primer, plus PPG Amerlock 2 protective coating or an equivalent. Products must be NSF/ANSI/CAN 61 approved. Use bond-breaker tape under fills when needed. - Safety and protection: Work includes confined-space entry, atmospheric monitoring, ventilation, rescue planning, and containment to keep debris, blast media, coatings, and other contaminants out of the reservoir drainage system and outside the work area. - Waste handling: Contractor must characterize, sample as needed, segregate, label, and stage waste in District-provided containers. A separate District-contracted vendor handles disposal and off-hauling. - Experience and qualifications: Relevant industrial sealant and asbestos-containing sealant removal experience, sealant-work and hazardous-material categorization certifications, and applicable California asbestos-work credentials are required. - Performance timing: Start within eight weeks after award and complete within six months after work begins.

Description

East Bay Municipal Utility District is seeking proposals for maintenance work at Stott Reservoir to remove, replace, and clean up joint sealants, with approximately 1,180 linear feet identified. The work includes surface preparation, abrasive blasting and protective coating of designated surfaces, confined space entry, handling and categorization of removed materials, and environmental protection measures; a separate District-contracted vendor will dispose of and haul away waste. Work must start within eight weeks after contract award and be completed within six months of starting. Responses are due November 24, 2026, at 2:00 p.m. PST.

View original listing