Opportunity
Georgia Procurement Registry #PE-56300-RFQ-2027-000000028
Coffin Gym air-handler replacement and related HVAC and electrical work
Posted
October 26, 2026
Respond By
December 03, 2026
Identifier
PE-56300-RFQ-2027-000000028
NAICS
238220, 238210
The College of Coastal Georgia is seeking a contractor to replace the Coffin Gym air handler and complete associated HVAC and electrical work at its Brunswick campus. - Government buyer: College of Coastal Georgia, a State of Georgia institution; Coffin Gym, Brunswick campus, Glynn County, Georgia. - Requested work: One lump-sum construction project covering HVAC demolition and installation, controls, pumps, heating coils, duct and damper work, and related electrical work. - Major equipment and quantities: - One AH-G-1 air-handling unit, scheduled at 20,250 CFM with a five-fan array and 25 HP total fan motor capacity. No HVAC OEM or model number is specified. - Two duct-mounted heating coils, HC-G-1 and HC-G-2; each is shown as 36 x 36 inches minimum and 250 MBH. - Four LED strip fixtures. Listed manufacturer/model options are Metalux 4SNLED-LD5-50SL-LW-UNV-L835-CD1; Lithonia ZLIN L48 SMR 5000LM FST MVOLT 35K 80CRI WH; LSI SDL4 LED 40L FL UNV DIM1 35 80CRI; or Elite 4 OEC LED 3000L/4000L/5000L DIM10 MVOLT 35K/40K/50K 85K. Approved equals are permitted. - One emergency lighting wall pack from Dual-Lite, Sure-Lite, Lithonia, or Cooper/Eaton, or an approved equal. Requirements include white finish, damp-rated construction, wireguard, 90-minute backup, charging LED, test button, and nickel-cadmium battery. - Named OEMs/manufacturers: Metalux, Lithonia, LSI, Elite, Dual-Lite, Sure-Lite, and Cooper/Eaton. The available information does not identify a manufacturer for the HVAC equipment. - Period of performance: No start date, completion date, or project duration is stated. This is a construction project, not a stated annual subscription.
Description
The College of Coastal Georgia seeks bids to replace the air handler at Coffin Gym on its Brunswick Campus. The project includes HVAC and related electrical work described in the attached bidding documents and drawings. A mandatory pre-bid conference is scheduled for November 12, 2026, at 10:00 AM at the College's Physical Plant Conference Room. Bids are due December 3, 2026, at 2:00 PM ET; bids must include a bid bond of at least 5% of the bid, and performance and payment bonds of 100% of the contract sum will be required.