Opportunity

Utah Public Procurement Place U3P #PR2026001042

Provo City CM/GC preconstruction for Water Reclamation Facility buildings

Posted

October 26, 2026

Respond By

November 24, 2026

Identifier

PR2026001042

NAICS

236220, 237990

Provo City is seeking a construction manager/general contractor for a new Water Reclamation Facility administration and collections buildings project. - Government buyer: Provo City Public Works Department, Division of Water Resources. - Requested services: CM/GC preconstruction planning and management, with construction services possible if the parties agree on a Guaranteed Maximum Price (GMP). The project includes the administration and collections buildings and site work such as access, utilities, parking, grading, paving, and landscaping. - Project budget: The estimated total project budget is approximately $12 million; this is not identified as the CM/GC fee or contract value. - Notable requirements: Open-book estimates; project packaging and phasing, including early procurement options; constructability and value-engineering reviews; and CM/GC self-performance of at least 50% of project scope, subject to City approval. - Foundation design criteria: R38N micropile center bars or engineer-approved equivalents, with typical pile lengths of 22, 37, 46, and 49 feet; steel casing with a 9.625-inch outside diameter and minimum 0.415-inch wall thickness; specified grout strength; and 6-by-6-by-1-inch bearing plates or equivalents. Production micropile quantities are not stated. Two sacrificial micropiles are specified for verification testing to at least 200% of design load. - Site investigation: ConeTec, Inc. is identified in the project materials for a CPTu investigation comprising five soundings. - Named firms: Water Works Engineers, LLC, IGES, Inc., and ConeTec, Inc. appear in project, design, or investigation documents; none is identified as a required product supplier or OEM.

Description

Provo City is seeking a specialty building construction manager/general contractor (CM/GC) for the Provo City Water Reclamation Facility Administration and Collections Buildings Project at the existing facility. The selected CM/GC will provide preconstruction services, with project delivery planned using the CM/GC method. The project addresses the administration and collections buildings and related site improvements, including an access road, gated entry, parking, grading, paving, and landscaping. A mandatory onsite pre-proposal meeting is scheduled for November 3, 2026, and proposals are due November 24, 2026.

View original listing