Opportunity

Wichita Bonfire #468-2026-028848

Wichita 30-inch sanitary sewer rehabilitation and liner installation

Posted

October 23, 2026

Respond By

November 13, 2026

Identifier

468-2026-028848

NAICS

237110

The City of Wichita is seeking bids for rehabilitation of a damaged 30-inch sanitary sewer main in Wichita, Kansas. - Government buyer: City of Wichita, Public Works & Utilities Department; Purchasing. Project questions are directed to the City Engineer’s Office. - Project: 2026 Sanitary Sewer Rehabilitation Phase A, project 468-2026-028848 / S6014. - Requested work: Install approximately 1,036 linear feet of liner in the existing 30-inch VCP sewer between manholes 5445-027 and 5445-191, from S McLean to S Seneca, crossing 2010 S Seneca. Work includes inspection and cleaning, traffic control, site preparation and restoration, bypass pumping, liner installation, service reinstatements, and post-installation video and logs. - Liner systems: Cured-in-place pipe (CIPP) is specified. Fold-and-Form Pipe (FFP), a PVC rehabilitation pipe, is also covered by the specifications, and Form High Modulus PVC liner pipe is permitted. No OEM or construction vendor is explicitly identified by name. - Notable requirements: Work must conform to applicable ASTM standards and include performance testing and final inspection. Existing service connections must be maintained during installation; only active connections are to be reopened after lining. Service interruptions may not exceed 12 hours unless arrangements are made with building occupants. Reinstatements are to use CCTV and remote cutting equipment without excavation where applicable.

Description

The City of Wichita is seeking bids for construction services for the Public Works & Utilities Department. The project includes sanitary sewer rehabilitation, including installation of approximately 1,036 linear feet of 30-inch cured-in-place liner between manholes 5445-027 and 5445-191. The bid table includes lump-sum items for traffic control, site preparation, site restoration, and bypass pumping, as well as a measured-quantity liner item. Work must be completed within 40 working days from the date work begins; a 5% bid bond or annual bid bond is required, and the successful bidder must provide performance and labor and material payment bonds.

View original listing