Opportunity

City of Industry PlanetBids #CITY-1558

Railroad Street roadway, streetlighting, power duct, and fiber-optic improvements

Posted

October 22, 2026

Respond By

December 03, 2026

Identifier

CITY-1558

NAICS

237310, 237130, 238210

The City of Industry’s Railroad Street project combines roadway reconstruction with streetlighting, underground power, and fiber-optic improvements from Azusa Avenue to Fullerton Road. - Government buyer: City of Industry, Engineering Department, Los Angeles County, California. - Project scope: Reconstruct roadway and streetscape features, install streetlights, and build underground power duct and fiber-optic infrastructure. - Civil work includes excavation and recompaction, pavement and base construction, utility-structure adjustments, curb, gutter, sidewalk and driveway work, drainage, landscape and irrigation changes, signs, markings, and restoration of 25 traffic-loop detectors. - Major civil quantities include 5,980 CY of excavation, 13,465 CY of over-excavation and recompaction, 14,870 TN of asphalt, 8,470 CY of Class 2 base, and 38,215 SY of Tensar InterAx NX750 geogrid or approved equal. - Key OEMs and named vendors: Tensar; Ameron; Cooper; Ubicquia; Jensen; Strongbox; Cooper Bussmann; Utilco; Burndy; S&C; Okonite; Elastimold; Hubbell; SEL; and Radio Ranger. - Streetlighting: Install 34 Ameron 1C123 poles with 1AP12 mast arms, 34 Cooper LED luminaires, and 34 City-furnished Ubicquia UBC-30-0-1-NA-01-1-GY controllers. Install 36 No. 5 and 5 No. 6 Jensen pull boxes, plus specified conduits, conductors, foundations, fuses, secondary bars, and connectors. Coordinate with the City GIS group to make the controllers’ remote monitoring system functional. - Power and fiber: Install 52,000 LF of 6-inch and 6,500 LF of 5-inch PVC power conduit, 19,700 LF of 3-inch fiber conduit, ten 7' × 14' × 8' vaults, and one 10' × 20' × 10' vault. Install City-furnished S&C switchgear, a 50-kVA transformer, Okonite feeder cables, and specified Elastimold, Hubbell, SEL, and Radio Ranger equipment. Work includes partial-discharge testing, 12-kV switching and energization, and secondary conductors. - Notable requirements: Approved equals are permitted for many specified products. The City furnishes certain controllers and power equipment for installation. The stated project duration is 150 working days.

Description

The City of Industry is seeking bids for improvements on Railroad Street from Azusa Avenue to Fullerton Road. The work includes reconstruction of existing asphalt pavement, new PCC sidewalk on the north side, and reconstruction of driveways, curb ramps, curb, and gutter. It also includes installation of a new streetlight system and construction of power and communication conduits, vaults, switch pads, a transformer and transformer pad, primary pull boxes, power cables, switches, and related electrical devices. The stated project duration is 150 working days.

View original listing