Opportunity

Georgia Procurement Registry #PE-64452-NONST-2027-000000038

Honeysuckle Park Field House Renovation

Posted

October 22, 2026

Respond By

December 02, 2026

Identifier

PE-64452-NONST-2027-000000038

NAICS

236220, 238160, 238310, 238320, 238210, 238350

The City of Doraville is seeking a contractor to renovate the Honeysuckle Park Field House in Doraville, Georgia. - Government buyer: City of Doraville, including its Public Works function. - Scope: Provide labor, materials, equipment, and supervision for demolition, disposal, installation, and related building improvements. - Roofing: Remove the existing EPDM membrane and install a mechanically fastened 60-mil TPO membrane over 1/2-inch high-density coverboard, with flashing, drip edge, replacement wood as needed, box gutters, and downspouts. - Interior and exterior repairs: Replace upstairs drywall, add insulation as needed to meet a minimum R-13 for wood-frame exterior walls, rebuild the downstairs kitchen ceiling with 1/2-inch moisture-resistant gypsum board, replace rotted siding, and perform specified painting and cove-base work. - Electrical and other items: Install new wiring, recessed-light rough-ins and fixtures at existing switch locations (approximately 70 lights), and one 54-by-22.5-inch aluminum pull-down attic ladder; flooring repairs or replacement are also included in the renovation scope. - OEMs and vendors: No OEMs, manufacturers, vendors, or product brands are named in the solicitation. - Notable requirement: The stated contract duration is 90 calendar days.

Description

The City of Doraville is seeking bids from qualified contractors to renovate and improve the existing Honeysuckle Park Field House. Work includes roof replacement and related drainage components, drywall and insulation, painting, flooring and electrical improvements, and associated demolition, removal, and installation of new materials. The detailed scope includes replacing the EPDM roof membrane with a TPO system, installing new gutters and downspouts, renovating interior areas, and adding recessed lighting. The contractor must provide all labor, materials, equipment, and supervision; the contract duration is 90 calendar days.

View original listing