Opportunity
SAM #FA9101FSSIII_QAs
Air Force Facility Support Services III draft-RFP Q&A outlines integrated base support requirements
Buyer
AETC PKP Procurement Branch
Posted
October 22, 2026
Identifier
FA9101FSSIII_QAs
NAICS
561210, 561612, 922160, 541620, 541690
The Air Force Test Center has released the final Q&A for the Facility Support Services III draft RFP, outlining integrated support at Arnold AFB and geographically separated sites. - Opportunity status: Informational notice sharing draft-RFP answers for solicitation FA910127RB001; it is not the final solicitation. - Set-aside and locations: Total Small Business Set-Aside. Work supports Arnold AFB, White Oak, Maryland, and Moffett Field, California. - Service areas: Security Services, Operational Command and Control (C2), Fire and Emergency Services, Environmental, and Safety programs. - Contractor-provided assets: Two fully equipped ambulances, one marked mid-size SUV for an explosive detection dog (EDD), and one contractor-provided EDD canine and handler. Five personnel staff the Visitor Control Center during operating hours. - Notable workload and requirements: Fire staffing includes 13 firefighters on daily floor staffing, with an Assistant Chief and two paramedics bringing the total to 15; average emergency workload is 15.5 calls per month. Safety work includes about 425 inspections annually and at least 20 spot inspections monthly. Environmental support includes hazardous-waste management and specified work at White Oak and Moffett Field. - Other requirements: Maintain an Alternate Operations Center capability and test it quarterly. Supplemental Work is cost-reimbursement, no-fee LIN X007 for qualifying unpredictable work; offerors must enter $5,000 for the base and each option period for evaluation. - Transition and term details: The final RFP is expected to include a six-month Option Period 5 and a three-month phase-out, scheduled for September 1–November 30, 2032. Phase-in and phase-out LINs are priced for three months; other base and option dates are not provided in the Q&A summary.
Description
THIS ANNOUNCEMENT IS NOT A NOTICE OF SOLICITATION ISSUANCE. THIS IS A SPECIAL NOTICE FOR INFORMATIONAL PURPOSES ONLY.
The Air Force Test Center (AFTC), Arnold Engineering Development Complex (AEDC) posted the Facility Support Services (FSS) III Draft RFP on Aug 31, 2026.
The purpose of this posting is to provide interested parties with access to the final questions and answers from the draft RFP. Please see the attached document.
All future updates regarding the FSS III acquisition will be posted on SAM.gov or in the solicitation module in PIEE.