Opportunity

Shelton Opengov #2027-10

Shelton High School band-room accessibility upgrades, including lift and riser work

Posted

October 22, 2026

Respond By

November 13, 2026

Identifier

2027-10

NAICS

236220, 238290

The City of Shelton is seeking accessibility upgrades to the band room at Shelton High School in Connecticut. - Buyer and project - City of Shelton, through the Board of Education; project site is Shelton High School, Shelton, Connecticut. - Landmark Architects is identified as the designer for the project drawings. - Requested work - Provide and install a wheelchair lift to access the band-room riser levels, with required materials and wiring for operation. - Modify and extend concrete risers, demolish portions as needed, and install steel rails at platforms and steps. - Drawings also list rubber flooring, alternate vinyl flooring, vinyl cove base, a suspended ceiling, and LED retrofit fixtures. The ceiling and flooring scope differs between the initial solicitation summary and the drawing summary; confirm which items are included. - OEMs and specified products - Garaventa Lift — Genesis Vertical Platform Lift; initial solicitation summary specifies one unit, but no part number is provided. - RAM Elevators & Lifts — Trust Lift 750, a portable wheelchair lift with a 34-by-54-inch platform, 55-by-54-inch footprint, and 550-pound capacity. The drawings do not state a quantity. - Nora Rubber Flooring — Norament 24-by-24-inch rubber tile with shaped stair nosings, risers, and wall base; color selected by the Owner. - Armstrong — Standard Excelon 12-by-12-inch vinyl tile, listed as alternate flooring. - Tarkett — 4-inch vinyl cove base. - Scope and specification items to clarify - The initial solicitation names a Garaventa Genesis lift, while the drawings specify a RAM Trust Lift 750. Confirm the required lift manufacturer and model. - The initial summary says riser extensions are to be left ready for tile installation by others and that floor finishes are excluded; the drawings list Norament flooring and alternate vinyl flooring for platform areas. - Choral-room renovation and office demolition are omitted. Lift, flooring, rail, ceiling, and lighting quantities are not stated in the attachment summary; the initial solicitation specifies one Garaventa lift.

Description

The City of Shelton is seeking sealed competitive bids for ADA remediation at Shelton High School, 120 Meadow Street, Shelton, Connecticut. Work includes extending and modifying band-room risers to ADA-compliant depth and installing steel railings according to the project drawings. The contractor must furnish and install one Genesis Vertical Platform Lift that reaches all band-room riser levels, including wiring and materials for turnkey operation. Chorus-room, office and practice-room work, along with floor-finish and ceiling replacement work, is no longer in scope.

View original listing