Opportunity
Delaware My Market Place #OMB-MC1002001330
Demolition of nine buildings at the former Plummer Community Corrections Center
Posted
October 21, 2026
Respond By
November 23, 2026
Identifier
OMB-MC1002001330
NAICS
238910
Delaware seeks a contractor to demolish nine buildings at the former Plummer Community Corrections Center. - Government buyer: State of Delaware, Office of Management and Budget, Division of Facilities Management. - Project: Complete demolition and removal of nine buildings, including foundations, footings, concrete slabs, and below-grade construction; project identifier MC1002001330. - Scope requirements: Remove and dispose of demolition debris in accordance with applicable regulations; disconnect, cut, and permanently cap utilities at or near each building; preserve utility distribution systems and protect existing site improvements; backfill and rough grade excavations. - Exclusions: Hazardous and regulated material abatement will be performed by others. Comprehensive site grading, paving replacement, landscaping, and redevelopment are not included. - Named organizations: StudioJAED (also referenced as Studio JAED) is identified as project architect and a source of contract documents; Reprographics Center, Inc. is also identified as a contract-document source. Neither is identified as the demolition contractor or an OEM. - OEMs and products: No OEMs, manufactured products, or product part numbers are specified.
Description
The project consists of the complete demolition and removal of nine existing buildings at the former Plummer Community Corrections Center, including foundations, footings, concrete slabs, and below-grade construction. Demolition debris must be removed and disposed of in accordance with applicable regulations, and utilities must be disconnected, cut, and permanently capped near each building while existing site utilities and improvements are protected. Building excavations must be backfilled and rough graded to safe, stable, and properly draining conditions; comprehensive site grading, paving replacement, landscaping, and redevelopment are excluded. Hazardous and regulated material abatement will be completed by others before demolition. Attendance at the November 5, 2026 mandatory pre-bid meeting is a prerequisite for bidding.