Opportunity
New York State Contract Reporter #2140052
Melvin Hill Road Precast Culvert Replacement and Highway Work
Posted
October 20, 2026
Respond By
November 10, 2026
Identifier
2140052
NAICS
237310, 237990
The Town of Phelps Highway Department is seeking a contractor to replace the Melvin Hill Road culvert in Ontario County, New York. - Buyer and project: Town of Phelps Highway Department; PIN 4BNY94, contract D041641, and project number 60-24-294. The project is over a tributary to Canandaigua Outlet. - Main work: Remove the existing concrete culvert and install a four-sided, single-span precast concrete box culvert on a gravel foundation, with roadway, stream, drainage, erosion-control, railing, and site-restoration work. The work is planned on the existing alignment, with a signed off-site detour. - Major scheduled quantities: 34 LF of precast box culvert (bid schedule: 12-foot span by 6-foot rise); 1,175 SF of sheet-applied waterproofing membrane; and roadway reconstruction materials, barriers, drainage and erosion-control items. Plans describe the culvert rise as 6 feet 6 inches, while the bid schedule lists 6 feet; bidders should resolve this specification discrepancy. - OEMs and named organizations: No OEM, manufacturer, product brand, or prospective bidder is identified. Ravi Engineering and Land Surveying, P.C. is named as the technical/design contact, not as a product manufacturer. - Notable requirements: Complete the work within 120 calendar days after Notice to Proceed. Requirements include prevailing wages, OSHA 10 compliance, a contractor-obtained county detour permit, and participation goals of 6% SDVOB, 7% MBE, and 11% WBE. Liquidated damages are $1,500 per day when a delay prevents landowners from accessing fields for planting. - Estimated value: Approximately $500,000–$1,500,000; no project value is stated in the provided information.
Description
The Town of Phelps is seeking sealed bids to remove the existing concrete culvert and replace it with a four-sided, single-span precast concrete box structure on a gravel foundation. The work also includes associated highway approach and stream work, with construction on the existing alignment and a signed off-site detour to maintain traffic. The project duration is 120 days from Notice to Proceed for the 2027 construction season. The stated participation goals are 6% SDVOB, 7% MBE, and 11% WBE.