Opportunity

PIEE #W912HN27S5000

Atlantic Intracoastal Waterway Maintenance Dredging at Hell Gate, Florida Passage, and Fields Cut

Buyer

W074 ENDIST SAVANNAH

Posted

October 19, 2026

Respond By

November 20, 2026

Identifier

W912HN27S5000

NAICS

237990

The U.S. Army Corps of Engineers’ Savannah District is seeking market information on maintenance dredging for the Atlantic Intracoastal Waterway. - Government buyer: U.S. Army Corps of Engineers, Savannah District. - Requested services: Maintenance dredging at three locations, with Florida Passage and Fields Cut identified as options. - Hell Gate, Chatham County, Georgia: Approximately 200,000 cubic yards; authorized channel width of 150 feet and depth of 12 feet. Sediment may be pumped about four miles to a beneficial-use placement site in tidal flats east of Ogeechee Bar. - Florida Passage, Jasper County, South Carolina: Option for approximately 15,000 cubic yards to the same width and depth. Sediment may be pumped about nine miles to the beneficial-use placement site east of Ogeechee Bar. - Fields Cut, Jasper County, South Carolina: Option for approximately 50,000 cubic yards to the same width and depth. Sediment will be placed in adjacent confined upland containment area DMCA 14B. - Method and scope: A hydraulic cutterhead dredge is the traditional method; alternative dredging methods may be considered. The anticipated work includes labor, transportation, mobilization and demobilization, equipment, materials, and related work. - OEMs and vendors: No OEMs, manufacturers, or vendors are named in the provided information. - Opportunity context: This is a sources-sought market research notice; it does not commit the Government to issue a solicitation or make an award.

Description

THIS IS A SOURCES SOUGHT ONLY. The Savannah District Corps of Engineers is requesting information regarding the market capabilities of potential contractors that can perform maintenance and unclassified dredging on the Atlantic Intracoastal Waterway (AIWW) sections of waterway Hell Gate and Florida Passage in Chatham County Georgia and Fields Cut in Jasper County South Carolina. This request does not obligate the Government in any way to post a Request for Proposal or award a contract. Information received will be considered for the purpose of market research and determining how to best move forward with the procurement. Applicable NAICS code is 237990 with a size standard of $45.0M. The potential magnitude for this requirement is estimated to be between $5,000,000 and $10,000,000. The FY26 Atlantic Intracoastal Waterway (AIWW) maintenance dredging contract provides construction services, including furnishing personnel, transportation, mobilization and demobilization, equipment and materials required in connection with maintenance dredging and incidental related work. This contract is traditionally performed with a hydraulic cutterhead dredge, but other methods will be considered. The duration is expected to be five months (165 days) from Notice to Proceed. The Savannah Districts area of responsibility (AOR) of the federally maintained channel in the Atlantic Intracoastal Waterway begins in Port Royal Sound, South Carolina and ends in Cumberland Sound, Georgia. The shallow draft federally maintained channel is twelve (12) feet deep MLLW with widths from ninety (90) feet in land cuts and one hundred fifty (150) feet in natural waterways. Savannah Districts FY26 AIWW maintenance dredging work is located within the state of Georgia (Chatham County) and in the state of South Carolina (Jasper County). The Hell Gate section of waterway is to be dredged to authorized width of 150 feet and depth of 12 feet. The work also includes options to dredge the Florida Passage and the Fields Cut sections of the waterway to authorized width of 150 feet and depth of 12 feet. Approximately two hundred thousand (200,000) cubic yards of maintenance material is anticipated to be removed from the Hell Gate section of the federally maintained channel in the waterway. Approximately fifteen thousand (15,000) cubic yards of maintenance material is anticipated to be removed from the Florida Passage section of the federally maintained channel in the waterway. Approximately fifty thousand (50,000) cubic yards of maintenance material is anticipated to be removed from the Fields Cut section of the federally maintained channel in the waterway. Sediment dredged from Hell Gate may be pumped approximately four (4) miles to a Beneficial Use placement site in tidal flats east of Ogeechee Bar. Sediment dredged from Florida Passage may be pumped approximately nine (9) miles to the Beneficial Use placement site in the tidal flats east of Ogeechee Bar. Sediment dredged from Fields Cut will be pumped to the adjacent confined upland containment area DMCA 14B. The attached Request for Information should be filled out and loaded via PIEE before the sources sought close on 20 November 2026, 11:00 a.m. (EST). Any questions should be emailed to the Contract Specialist, Rohan Bryan at Rohan.A.Bryan@usace.army.mil or Contracting Officer, Preston Jones at Preston.E.Jones@usace.army.mil.

View original listing