Opportunity

Nevada Ionwave #608087-26

Clark County Phase G roadway, waterline, drainage, lighting, and utility construction

Posted

October 14, 2026

Respond By

November 04, 2026

Identifier

608087-26

NAICS

237310, 237990, 237130

Clark County’s Phase G project upgrades roadway, water, drainage, lighting, and communications infrastructure on Las Vegas Boulevard and Flamingo Road. - Government buyer: Clark County, Nevada — Purchasing and Contracts office. - Project locations: Approximately one mile of Las Vegas Boulevard from Flamingo Road to Spring Mountain Road, plus approximately three-quarters of a mile of Flamingo Road from I-15 to Koval Lane. - Scope: Roadway removal, excavation, milling and paving; extensive concrete curb, sidewalk, median, bus-turnout and pedestrian-facility work; storm drainage; landscaping and irrigation; signs and pavement markings; street lighting; traffic signals; and communications and power infrastructure. - Key scheduled quantities include 59,390 of 1-inch UTACS, 14,200 of plantmix bituminous surface, 28,630 of concrete sidewalk, 4,476 of 24-inch ductile-iron waterline, 40 Smart poles (27 with dual luminaires and 13 without), and traffic-signal work at six Las Vegas Boulevard locations and four Flamingo Road locations. Units for schedule quantities are not supplied in the attachment summary. - Named organizations/providers in the bid schedule: Cox, Verizon, NVE (NV Energy), Las Vegas Valley Water District (LVVWD), Clark County Public Works (CCPW), and FAST. These are referenced in utility or infrastructure work; the documents do not identify a commercial product OEM or brand. - Notable requirements: Prevailing-wage requirements apply. Work includes replacement and connections for water, power, and communications infrastructure, as well as traffic control and landscape maintenance and warranty work. - OEMs: No product manufacturers or OEMs are identified by name.

Description

Clark County is soliciting bids for improvements to approximately one mile of Las Vegas Boulevard between Flamingo Road and Spring Mountain Road, and approximately three-quarters of a mile of Flamingo Road between I-15 and Koval Lane. Work includes roadway paving, curb and sidewalk reconstruction, medians, bus turnouts, street and landscape lighting, traffic signal modifications, utility adjustments, storm drainage, pavement markings, and signage. The Las Vegas Boulevard work also includes installing a new waterline along the project length to replace an existing Las Vegas Valley Water District waterline. The notice states that the procurement is a CC Invitation for Bid and gives a response deadline of November 4, 2026.

View original listing