Opportunity

City of Riverside PlanetBids #8264

Riverside Police Headquarters Phase A Demolition, Earthwork, and Shoring

Posted

October 16, 2026

Respond By

November 17, 2026

Identifier

8264

NAICS

238910, 237990, 237310

The City of Riverside is seeking a contractor for Phase A site preparation at the Riverside Police Headquarters project in Riverside, California. - Government buyer: City of Riverside, General Services Department; related off-site improvement drawings identify the Department of Public Works. - Scope: Demolish the existing police headquarters and associated improvements; clear the site; remove or protect utilities; perform over-excavation, rough grading, basement-pad preparation and certification, erosion control, earthwork, and shoring. The project also includes sewer and utility relocations and off-site street improvements. - Bid schedule and quantities: BC01 Earthwork and Shoring — one lump-sum line item and one allowance line item; the allowance is $180,000. BC02 Demolition — one lump-sum line item and one allowance line item; the allowance is $95,000. Each line item has a listed quantity of one. The estimated project value is $3,000,000. - Materials noted in the project schedule: Traffic control equipment and shoring beams and lagging material; quantities and part numbers are not specified. - Important requirements: The contractor is responsible for shoring design and structural calculations for review before construction. Designated historical features must be salvaged, and utility disconnections, removals, and protections coordinated. Hazardous-material reports identify asbestos-containing or presumed asbestos-containing materials and lead-containing materials. Work disturbing affected materials requires qualified abatement or lead workers, appropriate assessment and clearance, and required SCAQMD approval; demolition or renovation must remain suspended until the applicable asbestos procedure is completed and approved. - Named firms and organizations: Clean Harbors commissioned the asbestos and lead surveys by RegasGroup Environmental Consultants. Other firms named in project documents are Moore Twining Associates, Holt Architecture, VCA Engineers, Inc., Ultra Engineering Contractors, Inc., and Keller (referenced for shoring design). These are named consultants or project participants, not identified product OEMs. - OEMs: No product manufacturers or OEMs are specified.

Description

The City of Riverside is seeking bids for demolition of the current Riverside Police Headquarters and grading in preparation for the new headquarters. The scope includes earthwork and shoring (BC01) and demolition (BC02). Bids are submitted electronically, and a mandatory pre-bid meeting is scheduled for October 27, 2026, at 10:00 AM. The solicitation lists an estimated value of $3,000,000 and requires an A or C21 license.

View original listing