Opportunity

City of Sacramento PlanetBids #B27191121002

Earl Warren Park Restroom Replacement and Site Improvements

Posted

October 16, 2026

Respond By

November 18, 2026

Identifier

B27191121002

NAICS

236220, 238110, 238210, 238220, 238910, 238990

The City of Sacramento is seeking construction bids to replace the restroom at Earl Warren Park with a prefabricated accessible facility and complete related site improvements. - Government buyer: City of Sacramento, Department of Youth, Parks & Community Enrichment (YPCE), Park Planning & Development Services; project manager Dennis Day. - Primary OEM: Public Restroom Company supplied the City-purchased, prefabricated single-stall accessible all-gender restroom, model PS-011, job 13145. Quantity: 1. The contractor coordinates site preparation, delivery, installation, and utility connections. - Construction scope: Remove the existing restroom and associated concrete; prepare the site and building pad; connect sewer, water, and electrical services; install new concrete flatwork and an 18-inch concrete mow band; modify irrigation; restore affected areas with turf sod; and maintain the new turf during establishment. Provide one ADA portable restroom and one handwashing station for public use during construction. - Named product manufacturers: ACORN, BEMIS, ZURN, CHICAGO, PROFLO, STIEBEL, AMTROL, WATTS, KEYSTONE, NIBCO, FNW, JAY R SMITH, MUELLER, BOBRICK, ROYCE, FOUNDATIONS, FASTAIRE, ASI, SIGN ELEMENTS, SUNVENT, KNOX BOX, SQUARE D, AEL, SWP, GREENLIGHTING, LITHONIA, LEVITON, INTERMATIC, SECURITRON, and SDC. See product line items for specified models and part numbers. - Notable requirements: CDBG-related Section 3 and M/WBE requirements, Buy America requirements, prevailing wages, and a 65% construction-and-demolition waste diversion requirement. The contractor must protect existing site features designated to remain and coordinate applicable permits, inspections, and special-inspection documentation. - Estimated construction cost: $130,718. The bid documents specify 20 working days for construction plus a 30-calendar-day plant-establishment period; the initial notice describes 30 working days, so the construction-duration figures are inconsistent across the provided materials.

Description

The City of Sacramento is seeking bids to remove and replace the restroom at Warren Park, located at 160 45th Street in Sacramento. Work includes demolition of the existing restroom and associated concrete flatwork, preparation of the site, and installation of sewer, water, and electrical connections for a new prefabricated restroom building. The project also includes new aggregate base and concrete flatwork, a 12-inch mow band, temporary public restroom and handwashing facilities during construction, relocation of turf rotors, turf sodding, and 30-day landscape maintenance. The work is estimated at $130,718 and is to be completed within 30 working days; CDBG and Build America Buy America Act requirements apply.

View original listing