Opportunity

Collin College Opengov #FY2027-CSP-069

McKinney Campus Main Building Switchboard Replacement and Electrical Upgrades

Posted

October 16, 2026

Respond By

November 06, 2026

Identifier

FY2027-CSP-069

NAICS

238210, 236220

Collin College seeks a contractor for a one-time electrical and building upgrade project at its McKinney Campus Main Building. - Buyer: Collin County Community College District (Collin College), Construction Department; project location is the McKinney Campus Main Building in McKinney, Texas. - Scope: Replace the main service entrance switchboard and perform related electrical distribution work, including feeders, panels, transformers, connections, testing, and commissioning. Associated architectural work includes a new door assembly, threshold and subfloor work, and finish restoration. - Equipment: One SB-MAIN 4,000A switchboard, one 400A GDS400 generator docking station, one 100A GDS100 generator docking station, one Square D Power Logic PM5000 digital power meter, and one Lithonia linear suspended emergency light fixture. Door B102 is also specified as one 6-foot-by-7-foot pair of doors with a 20-minute fire rating. - OEMs: Square D is named for the digital power meter, and Lithonia is the basis-of-design manufacturer for the emergency light fixture. No manufacturer is specified for the main switchboard or generator docking stations. - Critical requirement: Keep the Network Operations Center (NOC), server room, and associated cooling equipment continuously powered during construction and utility outages. The contractor must coordinate outages and provide approved generator or temporary power arrangements. - Alternate work: If selected, Alternate #1 adds building-wide circuit and feeder identification, updated panel schedules, and checking and re-torquing terminations. - The project is a one-time construction effort; no fixed contract duration or completion period is stated. The estimated project budget is $1,000,000.

Description

Collin County Community College District is soliciting proposals for electrical upgrades to the main switchboard at the McKinney Campus Main Building. The work includes changing doors and feeders, removing existing panels and switchboards, and installing new equipment and feeders. The building’s main server room and network operations center and associated cooling equipment must remain powered continuously, including during switchboard replacement and utility shutdowns. The estimated project budget is $1,000,000, and the proposal deadline is November 6, 2026, at 3:00 p.m. Central Time.

View original listing