Opportunity

New York State Contract Reporter #2139974

SUNY Canton Synthetic Turf Field Replacement and Stadium Improvements

Posted

October 16, 2026

Respond By

November 06, 2026

Identifier

2139974

NAICS

238990, 238210, 237990

SUNY Canton is seeking a contractor to replace its stadium synthetic turf field and deliver associated lighting, site, and athletic-field improvements. - Government buyer: State University of New York (SUNY), State University of New York at Canton (SUNY Canton), Procurement/Purchasing Department. - Scope: Remove and replace the synthetic turf and infill; prepare and test the drainage base; complete grading, drainage, paving, electrical work, fencing, gates, and protective netting; and restore affected areas. - Named OEMs and products: A-Turf Titan-Diamond Blade RS 2.25/50, FieldTurf Vertex (FTVT-65), or Allsport Blend turf systems; Musco SportsCluster System with TLC for LED lighting; Sportsfield Specialties field equipment and netting; Daktronics delay-of-game timers and consoles; Gilman Gear lacrosse goals; and ACO System 7100 elastic curbing. Specified systems generally allow an approved equal. - Quantities and identifiers: Two Daktronics TI-2015 timers and two RC-100 handheld consoles; six 12-foot Sportsfield Specialties ATBBRPT12 benches; one pair of SG824R soccer goals and safety clamps; one SGWKL levered wheel-kit set; two lacrosse goals; one set of four SG6B1104 corner flags; approximately 1,400 linear feet of fence guard; and TNPPUC tension netting for the north and south sides as separate alternates. Turf and lighting quantities are not stated. - Notable requirements and options: Turf requires a 12-year manufacturer warranty and specified G-max testing. LED lighting requires a 10-year warranty, monitoring and communications coverage; field lighting use must not exceed 45.12 kW. Alternate work includes reuse of tested existing infill, stadium fencing and windscreen, north/south ball netting, and entertainment or RGB lighting. Participation goals are 30% MWBE (11% MBE and 19% WBE) and 6% SDVOB. - Construction period: Work is to be completed during a roughly three-and-a-half-month summer construction window. No option years or annual subscription are specified.

Description

SUNY Canton is requesting sealed bids for project 231054, Replace Synthetic Turf Field. The work includes replacement of the synthetic turf field and related site, drainage, fencing, lighting, and athletic-field components detailed in the project documents. Work is to be completed between May 3, 2027, and August 13, 2027. Bids are due November 6, 2026, at 2:00 p.m. local time, and bid security of at least 5% of the total bid is required.

View original listing