Opportunity

SAM #N0010426QFD00

Repair and refurbishment of one NAVSUP WSS ceramic ball kit

Buyer

NAVSUP Weapon Systems Support (WSS) Mechanicsburg

Posted

October 16, 2026

Respond By

November 16, 2026

Identifier

N0010426QFD00

NAICS

332919, 332911

NAVSUP WSS Mechanicsburg is seeking repair of one ceramic ball kit used in a critical shipboard system. - Government buyer: Naval Supply Systems Command Weapon Systems Support (NAVSUP WSS), Mechanicsburg. - Requested work: Teardown, evaluation, inspection, and refurbishment of one kit to like-new or “A” condition. - The kit contains one ball (Item 116) and two mating seats (Items 114 and 115). - Non-usable balls must be dispositioned; manufacturing new balls is not permitted under this requirement. - Named manufacturers and specifications: No specific OEM for the ball kit is identified. The solicitation references A & A Company Specification Navy016 Rev L for the Alumina-Titania/PTFE ball coating and specifies Polymer Corporation MC903 or equal for the seat material. - Pricing and technical requirements: Provide not-to-exceed or firm-fixed repair pricing, a separate beyond-repair/beyond-economic-repair price, and an approximate new-item cost if available. Shipping costs should not be included. Material traceability, certifications, specified material and dimensional requirements, inspection, and testing are required.

Description

Contact Information N743.49 | WVT | 771-229-0573 | benjamin.t.spangler.civ@us.navy.mil

Contract Clauses and Requirements ITEM UNIQUE IDENTIFICATION AND VALUATION (JAN 2023) HIGHER-LEVEL CONTRACT QUALITY REQUIREMENT (DEC 2014): See specification sections C and E. INSPECTION OF SUPPLIES--FIXED-PRICE (AUG 1996) INSPECTION AND ACCEPTANCE - SHORT VERSION GENERAL INFORMATION-FOB-DESTINATION: B WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (JAN 2023): Stand-Alone Receiving Report - Certifications Combo - Receiving Report & Invoice - Material | N/A | TBD | N00104 | TBD | N39040 - Certifications, S4306A - Material | N50286 | TBD | 133.2 | N/A | N/A | N39040 - Certifications | N/A | N/A | SEE DD FORM 1423 | PORT_PTNH_WAWF_NOTIFICATION@NAVY.MIL, BENJAMIN.T.SPANGLER.CIV@US.NAVY.MIL NAVY USE OF ABILITYONE SUPPORT CONTRACTOR - RELEASE OF OFFEROR INFORMATION (3-18) MANDATORY USE OF WORKFLOW PRO (WFP) MOD ASSIST MODULE WARRANTY OF SUPPLIES OF A NONCOMPLEX NATURE (JUNE 2003): One year from date of delivery. BUY AMERICAN-FREE TRADE AGREEMENTS-BALANCE OF PAYMENTS PROGRAM-BASIC (FEB 2024) SMALL BUSINESS SUBCONTRACTING PLAN (DOD CONTRACTS)-BASIC (DEV 2026-O0037)(JUL 2026) WARRANTY OF DATA-BASIC (DEVIATION 2026-O0035) (FEB 2026) NOTICE OF TOTAL SMALL BUSINESS SET-ASIDE (DEV 2026-O0037)(FEB 2026) SECURITY PROHIBITIONS AND EXCLUSIONS (CLASS DEVIATION 2026-O0025)(FEB 2026) BUY AMERICAN-FREE TRADE AGREEMENTS-BALANCE OF PAYMENTS PROGRAM CERTIFICATE-BASIC (FEB 2024) BUY AMERICAN-BALANCE OF PAYMENTS PROGRAM CERTIFICATE-BASIC (FEB 2024) ALTERNATE A, ANNUAL REPRESENTATIONS AND CERTIFICATIONS (DEVIATION 2026-O0043)(FEB 2026) NOTICE OF PRIORITY RATING FOR NATIONAL DEFENSE, EMERGENCY PREPAREDNESS, AND ENERGY PROGRAM USE (APRIL 2008): X

Additional Solicitation and Order Information DD1423 Data Items with title of “INSPECTION AND TEST PLAN” SUB TITLE “INSPECTION SYSTEM PROCEDURES” may be waived if already on file at NAVSUP WSS Mechanicsburg. Portsmouth NSY's DODAAC has changed from N00102 to N50286. Any reference to N00102 within this order should be updated to N50286. The following proposed delivery schedule applies: Submission of Certification Data CDRLs will be on or before 20 days prior to scheduled delivery. PNSY review/acceptance of Certification CDRLs: 6 working days after receipt of Certification DD 1423 CDRLs. Final delivery of material will be on or before 137 days after effective date of the resulting contract. Any contract awarded as a result of this solicitation will be a “DO” rated order; “DO” rated order certified for national defense use under the Defense Priorities and Allocations System (DPAS). NAVSUP WSS Mechanicsburg will be considering past performance in the evaluation of offers in accordance with DFARS 252.204-7024. If drawings are included in the solicitation, access needs to be requested on the individual solicitation page on Contracts Opportunities on the Government's SAM.gov website. After requesting access, send an email to the Primary POC listed on the solicitation. This order is issued pursuant to Emergency Acquisition Flexibilities (EAF). This is a Level 1 Repair. Please submit NOT TO EXCEED (NTE) pricing or FIRM FIXED PRICE (FFP). This includes the teardown, evaluation, inspection and full repair of the item to “like new” or “A” condition. See statement of work in solicitation. Please also provide an approximate cost of new item if available. A beyond repair (BR)/beyond economic repair (BER) price shall also be provided in addition to the repair price at time submission of quote. Do NOT include the cost for shipping material as the government implemented shipping system or ATAC will be shipping/delivering material. This contract utilizes Commercial Asset Visibility (CAV). See clause NAVSUPWSSFA25 for further details.

1. Scope 1.1 The material covered in this contract/purchase order will be used in a crucial shipboard system. The use of incorrect or defective material would create a high probability of failure resulting in serious personnel injury, loss of life, loss of vital shipboard systems, or loss of the ship itself. Therefore, the material has been designated as SPECIAL EMPHASIS material (Level I, Scope of Certification, or Quality Assured) and special control procedures are invoked to ensure receipt of correct material.

2. Applicable Documents 2.1 Order of Precedence. In the event of a conflict between the text of this contract/purchase order and the references and/or drawings cited herein, the text of this contract/purchase order must take precedence. Nothing in this contract/purchase order, however, must supersede applicable laws and regulations unless a specific exemption has been obtained. 2.2 Applicable Documents. The document(s) listed below form a part of this contract/purchase order including modifications or exclusions. 2.2.1 Specification Revisions. The specification revisions listed under “Documents References” below are the preferred revision. Older and/or newer revisions are acceptable when listed within Contract Support Library Reference Number CSD155 in ECDS (Electric Contractor Data Submission) at: https://register.nslc.navy.mil/. This is to allow Contractors to use certain acceptable older specification revisions to purge their existing stock of material certified to those older revisions or to use newer specification revisions when material is certified to newly released revisions, without requiring the submittal of waiver/deviation requests for each specification revision on every contract. Revisions of specifications reflecting editorial and/or re-approval (e.g. E2009, R2014, etc.) are considered inconsequential, but are acceptable when their revisions are listed within CSD155 or elsewhere within this contract. 2.2.2 Documents, drawings, and publications supplied are listed under “Drawing Number”. These items should be retained until an award is made. 2.2.3 “Document References” listed below must be obtained by the Contractor. Ordering information is included as an attachment to this contract/purchase order.

Drawing Data DRAWING DATA=EB-2000 |96169| C|SP |D|0001 | C|49998|0484385 DRAWING DATA=4384676 |53711| C| |D|0001 | C|00026|0000000 DRAWING DATA=7016077 |53711| B| |D|0001 | B|49998|0175546 DRAWING DATA=7016077 |53711| B| |D|0002 | B|49998|0144180 DRAWING DATA=7016077 |53711| B| |D|0003 | B|49998|0157797 DRAWING DATA=7016077 |53711| B| |D|0004 | B|49998|0219730 DRAWING DATA=7016077 |53711| B| |D|0005 | B|49998|0175065 DRAWING DATA=7016077 |53711| B| |D|0005.1 | B|49998|0433181 DRAWING DATA=7016077 |53711| B| |D|0006 | B|49998|0137035 DRAWING DATA=7016077 |53711| B| |D|0007 | B|49998|0114084 DRAWING DATA=7016077 |53711| B| |D|0008 | B|49998|0149567 DRAWING DATA=7016077 |53711| B| |D|0009 | B|49998|0121920 DRAWING DATA=7016077 |53711| B| |D|0010 | B|49998|0169937 DRAWING DATA=7016077 |53711| B| |D|0011 | B|49998|0102221 DRAWING DATA=7016077 |53711| B| |D|0012 | B|49998|0076363 DRAWING DATA=7016077 |53711| B| |D|0013 | B|49998|0130062 DRAWING DATA=7016077 |53711| B| |D|0013.1 | B|49998|0055906 DRAWING DATA=7016077 |53711| B| |D|0014 | B|49998|0110930 DRAWING DATA=7016077 |53711| B| |D|0015 | B|49998|0157569 DRAWING DATA=7016077 |53711| B| |D|0016 | B|49998|0096892 DRAWING DATA=7016077 |53711| B| |D|0017 | B|49998|0105348 DRAWING DATA=7016077 |53711| B| |D|0018 | B|49998|0079948 DRAWING DATA=7016077 |53711| B| |D|0019 | B|49998|0106131 DRAWING DATA=7016077 |53711| B| |D|0020 | B|49998|0071311 DRAWING DATA=7016077 |53711| B| |D|0021 | B|49998|0091132 DRAWING DATA=7016077 |53711| B| |D|0022 | B|49998|0070819 DRAWING DATA=7016077 |53711| B| |D|0023 | B|49998|0110036 DRAWING DATA=7016077 |53711| B| |D|0024 | B|49998|0103251 DRAWING DATA=7016077 |53711| B| |D|0025 | B|49998|0124278 DRAWING DATA=7016077 |53711| B| |D|0026 | B|49998|0100543 DRAWING DATA=7016077 |53711| B| |D|0027 | B|49998|0139517 DRAWING DATA=7016077 |53711| B| |D|0028 | B|49998|0133775 DRAWING DATA=7016077 |53711| B| |D|0029 | B|49998|0092742 DRAWING DATA=7016077 |53711| B| |D|0030 | B|49998|0077445 DRAWING DATA=7016077 |53711| B| |D|0031 | B|49998|0094077 DRAWING DATA=7016077 |53711| B| |D|0032 | B|49998|0067914 DRAWING DATA=7016077 |53711| B| |D|0033 | B|49998|0094440 DRAWING DATA=7016077 |53711| B| |D|0034 | B|49998|0088128 DRAWING DATA=7016077 |53711| B| |D|0035 | B|49998|0078641 DRAWING DATA=7016077 |53711| B| |D|0036 | B|49998|0075186 DRAWING DATA=7016077 |53711| B| |D|0037 | B|49998|0071460 DRAWING DATA=7016077 |53711| B| |D|0038 | B|49998|0068639 DRAWING DATA=7016077 |53711| B| |D|0039 | B|49998|0078106 DRAWING DATA=7016077 |53711| B| |D|0040 | B|49998|0069474 DRAWING DATA=7016077 |53711| B| |D|0041 | B|49998|0077366 DRAWING DATA=7016077 |53711| B| |D|0042 | B|49998|0082080 DRAWING DATA=7016077 |53711| B| |D|0043 | B|49998|0098311 DRAWING DATA=7016077 |53711| B| |D|0044 | B|49998|0063930 DRAWING DATA=7016077 |53711| B| |D|0045 | B|49998|0139043 DRAWING DATA=7016077 |53711| B| |D|0046 | B|49998|0195681 DRAWING DATA=7016077 |53711| B| |D|0047 | B|49998|0112401 DRAWING DATA=7016077 |53711| B| |D|0048 | B|49998|0188714 DRAWING DATA=7016077 |53711| B| |D|0049 | B|49998|0091075 DRAWING DATA=7016077 |53711| B| |D|0050 | B|49998|0108246 DRAWING DATA=7016077 |53711| B| |D|0051 | B|49998|0085364 DRAWING DATA=7016077 |53711| B| |D|0052 | B|49998|0093309 DRAWING DATA=7016077 |53711| B| |D|0053 | B|49998|0101459 DRAWING DATA=7016077 |53711| B| |D|0054 | B|49998|0081213 DRAWING DATA=7016077 |53711| B| |D|0055 | B|49998|0087062 DRAWING DATA=7016077 |53711| B| |D|0056 | B|49998|0082649 DRAWING DATA=7016077 |53711| B| |D|0057 | B|49998|0077652 DRAWING DATA=7016077 |53711| B| |D|0058 | B|49998|0067483 DRAWING DATA=7016077 |53711| B| |D|0059 | B|49998|0085396 DRAWING DATA=7016077 |53711| B| |D|0060 | B|49998|0068904 DRAWING DATA=7016077 |53711|B9|1N |D|0001 |B9|49998|0040107 DRAWING DATA=7016077B147 |53711| A|ER |D|0001 | A|49998|0078803 DRAWING DATA=7016077B147 |53711| A|ER |D|0001.1 | A|49998|0071521 DRAWING DATA=7016077B147 |53711| A|ER |D|0001.2 | A|49998|0076275 DRAWING DATA=7016077B147 |53711| A|ER |D|0001.3 | A|49998|0085170 DRAWING DATA=7016077B147 |53711| A|ER |D|0001.4 | A|49998|0082066 DRAWING DATA=7016077B147 |53711| A|ER |D|0001.5 | A|49998|0026339 DRAWING DATA=7016077B147 |53711| A|ER |D|0001.6 | A|49998|0026274 DRAWING DATA=7016077B147 |53711| A|ER |D|0002 | A|49998|0230472 DRAWING DATA=7016077B165 |53711| A|ER |D|0001 | A|49998|3807537 DRAWING DATA=7016077B66 |53711| B|ER |D|0001 | B|00026|0000000

Document Reference Data DOCUMENT REF DATA=FED-STD-H28 | | |B |190424|A| | | DOCUMENT REF DATA=FED-STD-H28 |0020| |B |941221|A| |01| DOCUMENT REF DATA=ANSI/ASQ Z1.4 | | | |080101|A| | | DOCUMENT REF DATA=ASTM-B367 | | | |220401|A| | | DOCUMENT REF DATA=ASTM-B381 | | | |130701|A| | | DOCUMENT REF DATA=MIL-STD-792 | | |F |060519|A| | | DOCUMENT REF DATA=ISO_9001 | | | |081115|A| | | DOCUMENT REF DATA=ISO10012 | | | |030415|A| | | DOCUMENT REF DATA=ISO/IEC 17025 | | | |050515|A| | | DOCUMENT REF DATA=MIL-I-45208 | | |A |810724|A| 1| | DOCUMENT REF DATA=MIL-STD-45662 | | |A |880801|A| | | DOCUMENT REF DATA=ANSI/NCSL Z540.3 | | | |130326|A| | | DOCUMENT REF DATA=0900-LP-001-7000 | | | |810101|C| |01| DOCUMENT REF DATA=S9074-AQ-GIB-010/248 | | |1 |191112|A| | | DOCUMENT REF DATA=T9074-AS-GIB-010/271 | | |1 |140911|A| | | DOCUMENT REF DATA=S9074-AR-GIB-010A/278 (CHG A) | | | |130214|A| | |

3. Requirements 3.1 Refurbished Material Statement of Work (Repair SOW) 3.1.1 Inspection. Clean and determine if refurbishment is possible. At disassembly, the Contractor must record all identifying markings found on the parts of each assembly. The Contractor must maintain traceability of these markings to each unit throughout refurbishment. 3.1.2 Identifying Markings. Part must have a MIC (Material Identification and Control) code, heat/heat lot code, or unique Contractor traceability number/code that is visible on the part. See Material Traceability in paragraph 3 (Quality Assurance Provisions) of this contract for traceability requirements. The MIC code can consist of a 2, 3, or 4 letter material identifier, 4 or 5 digit Julian date, 3 digit lot serial number, and Certifying Activity Designator (CAD) which will be 1 or 2 letters; the 4 parts are normally separated by hyphens; examples: TIA-3089-30-QQ and ST-06262-506-A. 3.1.3 Re-useable Parts Any parts of the original assembly that are useable (replacement is not necessary), that are properly marked as identified above, and that have material certifications available may be utilized as initially supplied. Certifications are not required to be resubmitted by the contractor. Any parts of the original assembly that are useable (replacement is not necessary), are properly marked as identified above, but material certifications are not available at the contractor's facility, a waiver must be submitted in accordance with Waiver/Deviation (Configuration Control) requirements specified elsewhere in the Contract. 3.1.4 Non-useable Parts Any parts of the original assembly that are not properly marked as identified above must be replaced and the required certifications must be submitted. Any parts of the original assembly that are not usable (replacement is necessary) must be replaced and the required certifications must be submitted. 3.1.5 Refurbishment. Upon completion of inspection, this item must be refurbished to be in accordance with Naval Ship Systems Command Drawing 845-7016077, ER7016077B66, ER7016077B147, and ER7016077B165 consisting of one Ball, Item 116 and one each mating Seats, Items 114 and 115; except as amplified or modified herein. This applies to all “Parts Requiring Certification” as identified elsewhere in this Contract/Purchase Order. 3.1.6 Additional SOW Requirements. Balls which are not usable must be dispositioned and new balls are not to be manufactured under this contract.

3.2 For seats, Items 114 and 115, dimension 1.562 inch nominal must be manufactured to 1.582 +/- 0.005 inch. The stack height requirement of ER7016077B66 does not apply. 3.3 Material for Parts Requiring Certification. Quantitative chemical and mechanical analysis is required for the parts listed below unless specifically stated otherwise. Part: Ball, Item 116 Material: Centrifugally cast 6AL-4V, ASTM-B367, Grade C-5, with mechanical properties as listed in Supplementary Requirements S6 and S8; or ASTM-B381, Grade F-5 with the following modified mechanical properties: Ultimate Tensile Strength — 125,000 psi Minimum (Longitudinal direction) Elongation in 4D — 10% Minimum Yield Strength — 115,000 psi Minimum Reduction of Area — Minimum 20% Part: Seats, Items 114 and 115 (Q3) Material: MC903 (Type 6 cast nylon produced with polyepsilon caprolactam by the direct polymerization process) as manufactured by the Polymer Corporation or equal in accordance with Electric Boat Division Specification 2000. Properties specified below only. ITEM PROPERTY ASTM TEST METHOD VALUE (A) Melting Point D789 221 deg C +/- 9 (430 deg F +/- 16) (B) Relative Viscosity D789 1500-6500 (RV is a unitless value, the RV test specimens must dissolve within a 120 hour period) (C) Specific Gravity D792 1.15 - 1.17 @ 23 deg C (73F) (D) Dimensional Change Note 1 .2% MAX (E) Tensile Impact D1822 80 FT-LB/SQ IN Type S Specimen Minimum Note 3 Note 2 (F) Tensile Yield Stress D638 9,000 PSI MIN Note 2 Note 3 (G) Compressive Strength D695 9,000 PIS MIN 1% Offset Note 2 Note 3 (H) Water Absorption D570 24 HR 1.3% MAX Saturation 7% MAX

Notes The test method to determine dimensional stability must be performed as follows: The test specimens must be measured at 23 deg C +/- 3 (73 deg F +/- 5) and placed in a mineral oil bath maintained 184 deg C +/- 3 (363 deg F +/- 5). The specimens must remain in the bath for six (6) hours at temperature and allowed to slow cool in the bath at a rate not to exceed 23 deg C +/- 3 (41 deg F +/- 5) per hour. When the bath reaches 23 deg C +/- 3 (73 deg F +/- 5), the test specimens must be removed and measured. The percent change in each dimension, outside diameter, inside diameter and thickness must not be greater than the value specified. Mineral oil meets the specifications as listed below: Description..........................Passes U.S.P. Test (USP XX, P.1143) Solubility...........................Passes U.S.P. Test (USP XX, P.1143) Neutrality...........................Passes U.S.P. Test (USP XX, P.532) Readily Corbonizable Substances......Passes U.S.P. Test (USP XX, P.532) Limit of Polynuclear Compounds.......Passes U.S.P. Test (USP XX, P.532) Solid Parafin........................Passes U.S.P. Test (USP XX, P.532) Specific Gravity @ 25 deg C (77F)....0.8600 to 0.8900 Viscosity @ 37.8 deg C (100 F).......73.6 to 84.4 Centistokes (340-390 SUS) Flash Point Cleveland Open Cup.......420 deg F (216 C) (Typical) Refractive Index @ 20 deg C (68F)....1.480 (Typical) Prior to test, specimens must be conditioned as follows: The specimens must be subjected to a temperature of 71 deg C +/- 3 (160 deg F +/- 5) under a vacuum to a maximum of one millimeter absolute pressure until a change of less than .2% between two weighings sixteen (16) hours apart is achieved. These values are minimum averages. Separate specimen values may not vary more than 25% under the specified minimum.

3.4 Testing Certification. Certifications are required for the following tests on the items listed below. Additional testing on other piece parts (if any) per applicable drawings is still required, but certifications are only required as listed below. Test: Non-Destructive Tests Item: Weld Repair and/or Production Weld (as applicable) Performance: Per applicable fabrication specification Acceptance: Per applicable fabrication specification 3.5 Alumina-Titania/PTFE coating of Ball(s) must be in accordance with A & A Company Specification Navy016 Rev L. Each Ball manufactured/repaired under this Order must be tagged with a durable non-metallic tag with the following statement: “Ball coated with Alumina-Titania/PTFE coating per A & A Company, South Plainfield New Jersey, proprietary procedure NAVY016 Rev L. This coating was approved by NAVSEA and these Balls are an approved replacement for the Ball, piece 2, of Naval Ship Systems Command Drawing 845-7016077.” 3.6 A visual inspection shall be performed on the finished seat with acceptance criteria on critical surfaces per CSD167 in the ECDS (Electronic Contractor Data Submission) system at: https://register.nslc.navy.mil/. 3.7 Ball Spherical Surface Waviness. Unless otherwise specified on drawing, all sealing area surfaces must have a spherical surface waviness which does not exceed 0.0005 inches of height per inch of spherical surface. Roughness and waviness ratings must apply in a direction which yields the maximum rating, normally perpendicular to the lay. 3.8 Surface waviness must be verified after Grinding/Finishing of Alumina-Titania coating and before PTFE application. Surface finish of the Alumina-Titania coating, prior to PTFE application, must be 32 Microinches. 3.9 Internal Threads. All internal threads must be formed by cutting. Cold forming of internal threads is not acceptable. 3.10 Thread Inspection Requirements. All threads on threaded parts must be inspected using appropriate inspection methods, inspection systems, and inspection gages/instruments in accordance with FED-STD-H28 series. Substitution of the commercial equivalent inspection in accordance with ASME B1 series is acceptable. 3.10.1 System 21 of FED-STD-H28/20 must be used as a minimum inspection requirement for threads when the design drawing or design specification does not specify an inspection requirement. 3.10.2 For Navy and Shipyard drawings, system 21 of FED-STD-H28/20 may be substituted for System 22 without further Navy approval when the design drawing invokes System 22 and does not cite governing specifications that specifically require system 22. System 22 of FED-STD-H28/20 must be used when the drawing references other governing specifications that specifically require System 22, such as certain thread types of MIL-DTL-1222. 3.10.3 A written request for concurrence must be submitted when utilizing alternative measuring equipment or measuring systems not applicable to the specified inspection system. 3.11 Welding or Brazing. When welding, brazing, and allied processes are required, as invoked by Section C paragraph 3 requirements, they must be in accordance with S9074-AR-GIB-010A/278, 0900-LP-001-7000 for brazing of piping and pressure vessel applications, or S9074-AQ-GIB-010/248 for brazing of other applications. For all production and repair welding and brazing, personnel and procedures must be qualified under S9074-AQ-GIB-010/248 or 0900-LP-001-7000, as applicable. Procedures and Qualification Data must be submitted for review and approval prior to performing any welding or brazing. 3.12 Certificate of Compliance (SPECIAL EMPHASIS MATERIAL). The Contractor must prepare and submit a certificate of compliance certifying that the items/components furnished under this contract comply with the requirements of the procurement document, including any/all invoked specifications and drawings. 3.13 Configuration Control. The Contractor must maintain the total equipment baseline configuration. For items of proprietary design, Contractor drawings showing the latest assembly configuration must be provided to the Government in electronic (C4) format. Definitions are provided elsewhere in the Contract/Purchase Order. 3.13.1 Waivers/Deviations. All waivers and deviations, regardless of significance or classification, require review and approval by the Contracting Officer. Waivers and Deviations must be designated as Critical, Major, or Minor. The Contractor must provide a copy of this request to the QAR. Requests must include: A complete description of the contract requirement affected and the nature of the waiver/deviation (non-conformance), including a classification of Critical, Major, or Minor. Number of units (and serial/lot numbers) to be delivered in this configuration. Any impacts to logistics support elements (such as software, manuals, spares, tools, and similar) being utilized by Government personnel or impacts to the operational use of the product. Information about remedial action being taken to prevent reoccurrence of the non-conformance. 3.13.2 All requests for Waivers/Deviations on NAVSUP-WSS Contracts must be submitted to the NAVSUP WSS Contracting Specialist via eMail. 3.13.3 ECPs. The Government will maintain configuration control and change authority for all modifications or changes affecting form, fit, function, or interface parameters of the Equipment and its sub-assemblies. The Contractor must submit an Engineering Change Proposal (ECP) for any Class I or II changes that impact the Equipment covered by this contract. ECPs must be prepared in Contractor format, and must include: The change priority, change classification (Class I or Class II), and change justification. A complete description of the change to be made and the need for that change. A complete listing of other Configuration Items impacted by the proposed change and a description of the impact on those CIs. Proposed changes to documents controlled by the Government. Proposed serial/lot number effectivities of units to be produced in, or retrofitted to, the proposed configuration. Recommendations about the way a retrofit should be accomplished. Impacts to any logistics support elements (such as software, manuals, spares, tools, and similar) being utilized by Government personnel in support of the product. Impacts to the operational use of the product. Complete estimated life-cycle cost impact of the proposed change. Milestones relating to the processing and implementation of the engineering change. 3.14 Mercury Free. Mercury and mercury containing compounds must not be intentionally added or come in direct contact with hardware or supplies furnished under this contract. Mercury contamination of the material will be cause for rejection. 3.15 NAVSEA 0948-LP-045-7010. Any applicable requirements of NAVSHIPS 4410.17, NAVSEA 0948-LP-045-7010, or 0948-045-7010 which the contractor must meet are included in this contract/purchase order. The above documents are for Government Use Only. Further application of the above documents is prohibited. 3.15.1 Marking of material with a Material Designator per the Drawing is also prohibited, with the exception of Fasteners. Fasteners must be marked with a Material Symbol/Designator as specified elsewhere in this contract.

Quality Assurance Requirements 3.16 See CDRL DI-MISC-80678 (Test Certification). A statement of tests performed, listing the pieces tested, must be furnished along with a copy of the test results. Certification must include the contractor's name, address and date, quantity inspected, identification to the contract/purchase order and item number, and the Contractor's or authorized personnel's signature. Test certifications must reference the standard/specification, including the revision, to which the testing was performed and the acceptance criteria used. Test procedure numbers may also be referenced on test reports. Test reports on weldments must be identified to weld joint and layer. 3.17 Quality System Requirements. The Contractor furnishing items under this contract/purchase order must provide and maintain a quality system in accordance with ISO-9001 as amplified or modified herein, with the calibration system requirements of ISO-10012 or ANSI-Z540.3 with ISO-17025. A Quality System in accordance with MIL-I-45208, with the calibration system requirements of MIL-STD-45662, is acceptable as an alternate. 3.17.1 The Contractor's quality system and products supplied under the system are subject to evaluation, verification inspection, and acceptance/non-acceptance by the Government representative to determine the system's effectiveness in meeting the quality requirements established in the Contract/Purchase Order. 3.17.2 The Contractor's quality system must be documented and must be available for review by the Contracting Officer or his representative prior to initiation of production and throughout the life of the contract. The Prime Contractor must, upon notification, make his facilities available for audit by the Contracting Officer or his authorized representative. 3.17.3 See CDRL DI-QCIC-81110 (Inspection System Procedures). All suppliers of Level I/SUBSAFE (LI/SS) material are required to submit a copy of their current documented quality system procedures to the Procurement Contracting Officer (PCO) prior to award of any contract/purchase order. Suppliers that have a copy of their current quality system procedures on file at the Procuring Activity may request the PCO waive this requirement. 3.17.4 This contract provides for the performance of Government Quality Assurance at source. The place or places of performance may not be changed without the authorization of the Procurement Contracting Officer. Upon receipt of this order, promptly notify the Government representative who normally services your plant so that appropriate planning for Government inspection can be accomplished. If you do not have an assigned Government representative, notify the nearest Defense Contract Management Agency (DCMA) Office. In the event that a local Government representative or DCMA Office cannot be located, our purchasing agent should be notified immediately. 3.17.5 Any changes made by the Contractor to a qualified quality system will require re-submittal to the PCO and concurrence by the Government Quality Assurance Representative prior to adoption. 3.18 Contractor Inspection Requirements. The Contractor must maintain adequate records of all inspections and tests. The records must indicate the nature and number of observations made, the number and type of deficiencies found, the quantities approved and rejected and the nature of corrective action taken as appropriate. Inspection records must be traceable to the material inspected. 3.18.1 The supplier's gages, measuring and test equipment must be made available for use by the Government representative when required to determine conformance with Contract requirements. When conditions warrant, the supplier's personnel must be made available for operations of such devices and for verification of their accuracy and condition. 3.18.2 All documents and reference data applicable to this contract must be available for review by the Government representative. Copies of documents required for Government inspection purposes must be furnished in accordance with the instructions provided by the Government representative. 3.19 Subcontractor Inspection Requirements. The Government has the right to inspect at source, any supplies or services that were not manufactured or performed within the contractor's facility. Such inspection can only be requested by or under authorization of the Government representative. Any purchasing documents to a subcontractor must cite the applicable portions of the contractually invoked quality system (e.g. calibration requirements), plus any product requirements that apply to the supplies being purchased. When the Government elects to perform source inspection at the subcontractor's facility, applicable purchase documents must be annotated with the following statement: “A Government inspection is required prior to shipment from your plant. Upon receipt of this order, promptly notify the Government representative who normally services your plant so that appropriate planning for Government inspection can be accomplished. If you do not have an assigned Government representative, notify the nearest Defense Contract Management Agency (DCMA) Office. In the event that a local Government representative or DCMA Office cannot be located, our purchasing agent should be notified immediately.” 3.20 The prime contractor's program must include procedures to assess the capability of the prospective suppliers to produce the products or supply the services in accordance with the contract, prior to the issuance of any purchase document. 3.20.1 Each sub-tier supplier of material or services for items in Section 3 of this contract must be subjected to a periodic review or audit by the Prime to determine the continued capability of the supplier to control the quality of the products or services specified in the purchase order or contract. 3.20.2 The prime contractor must ensure that the purchased product conforms to specified purchase requirements and this contract. The type and extent of control applied to the supplier and the purchased product must be dependent upon the effect of the purchased product on the end item represented by this contract. 3.20.3 The prime contractor must evaluate the requirements of the contract and select suppliers based on their ability to supply the product in accordance with the prime contractor's requirements and the contract. Criteria for selection and evaluation must be established. Records of this effort must be available for review by the government. 3.20.4 The prime contractor's supplier quality assurance program must provide for a review of purchase documents to assure applicable quality requirements are included or referenced in the documentation for compliance by the supplier. 3.21 Government Furnished Material and/or Equipment (GFM/GFE). When material or equipment is furnished by the Government, the Contractor must develop documented control procedures that require at least the following: Visual examination upon receipt to detect damage during transit. Inspection for completeness and proper type. Verification of material quality received. Periodic inspection and precautions to assure adequate storage conditions and to guard against damage from handling and deterioration during storage. Functional testing, either prior to or after installation, or both, as required by the Contract to determine satisfactory operation. Identification and protection from improper use or disposition. Reporting to the Government, any GFM or GFE property found damaged, malfunctioning, or otherwise unsuitable for use. In the event of damage or malfunction during or after installation, the supplier must determine and record probable cause and necessity for withholding the material from use. For GFE material, and as required by the terms of the bailment agreement, the supplier must establish procedures for adequate storage, maintenance, and inspection of bailed Government material. Records of all inspection and maintenance performed on bailed property must be maintained. Material returned to the contractor must be handled as GFM. 3.22 Traceability and Certification Requirements. To assure that correct materials are installed in Level I/SUBSAFE systems, it is imperative that traceability be maintained from the material to the material certification test report and other required Objective Quality Evidence (OQE). The material certification report must completely and accurately reflect that the material supplied meets the specified requirements. Materials requiring Traceability and Certification Data are identified within Paragraph 3, Section C of this contract/purchase order. 3.22.1 The following provides the minimum requirements for maintaining material traceability and supplements the requirements specified in DI-MISC-81020 and elsewhere in the contract/purchase order. The Contractor must develop written procedures that implement the material control requirements stated herein. 3.23 Material Traceability. The certification data report must be identified through a unique traceability number, heat-lot number, or heat-treat number for metallic material or batch of non-metallic material, as applicable, which must also be marked on the material. This traceability marking on the material must provide direct traceability to the material's chemical composition and mechanical properties certification data. For material produced by batch, continuous cast, or continuous pour processes, samples must be taken no less than once in every eight hours of operation for the purpose of validating proper chemical composition and mechanical properties. Traceability must be maintained through all process operations including any subcontracted operations, to the finished component. 3.23.1 Material Marking for Traceability and Identification. The following are the minimum marking requirements. Additional/alternate marking requirements, if applicable, will be specified elsewhere in the contract/purchase order. In addition to the marking requirements on applicable drawings and/or specifications, marking for traceability is required. All traceability markings must be permanently applied in accordance with MIL-STD-792 (except as specified below). An alternate marking method is permissible provided it is an available option in the contractually invoked specification or drawing, except in instances where the material has been modified by this contract/purchase order and differs from that specified in the specification or drawing. 3.23.2 Traceability markings for items with precision machined or plated surfaces, or material with suitable marking surface areas less than 3/8 inches square (either 3/8" x 3/8" or an area equal to 0.1406 inches square) must be applied to a durable tag and the tag securely affixed to the material. 3.23.3 Permanent marking must be legible and must be located so as to not affect the form, fit, and function of the material. The MIC markings and traceability or other identifying marks may be re-marked on top of the Ball near the Stem Hole in a non-working area. Seats to be marked on the outer cylindrical surface. 3.23.4 Seat Marking. Each seat must be permanently marked in accordance with MIL-STD-792, type I and as stated below, except for Teflon seats, which must only be tagged. Type IX marking may be substituted for type I, provided the minimum character size scribed by the marking tool must be approximately 3/32 inch high to insure legibility. Permanent marking is not permitted on Teflon seats. Seat marking requirements must maintain complete traceability to certification OQE. Seat marking must be either heat/lot or batch number, a vendor traceability number/code, or a combination thereof and must be unique to the material certification. 3.23.5 Traceability markings must be maintained through assembly, and whenever possible must be visible after assembly. For items where the marking is not visible after assembly, a durable tag must be securely attached to the item identifying the part number, piece number, traceability number, and the location of the permanent mark. 3.24 Material Certifications. See CDRL-DI-MISC-81020 (Chemical and Mechanical) and CDRL DI-MISC-80678 (SEAT MATERIAL). The following material certification requirements apply: 3.24.1 Metallic Material. Quantitative chemical and mechanical analysis of material traceable to traceability markings is required. Material certification test reports must include the class, form, condition, grade, type, finish, and/or composition, as applicable, of the material supplied. 3.24.2 Non-Metallic Material. The Contractor must furnish the applicable test reports for each heat/lot/batch of seat material. Material certification test reports must include, in addition to the specification, the class, form, grade, type, process, and/or composition, as applicable, of the material supplied. 3.24.3 Re-identification and re-certification of metallic material is required when the material is subjected to a process which alters its properties. If the starting material or raw stock is processed in a manner that will not affect its chemical composition or mechanical properties, the original certifications for the chemical composition and mechanical properties, as required by the material specification, are acceptable. Re-certification of the chemical or mechanical properties is required if a process is used during fabrication that alters the original properties of the material (e.g. alloying, heat treating, or forming). In these instances, the properties of the material must be re-determined and documented to reflect the altered condition. The altered material must be uniquely re-identified. The properties thus determined and documented are required for final certification and must conform to the material specification or the contract/purchase order requirements. When only the mechanical properties are altered, the original certification for chemical composition must be overstamped and annotated with the unique traceability marking used with the altered material and at a minimum contain the information below. TRACEABILITY MARKING________________________________________________ (marking on finished item) IS FABRICATED FROM RAW MATERIAL IDENTIFIED TO HEAT/LOT NUMBER _______________ AND HEAT TREAT NUMBER ______________________ (when applicable) _________________________________________ DATE _____________________ (name and signature of auth. co. rep.) 3.24.4 Material certification data forwarded by the manufacturer must contain a signed certification that the report results represent the actual attributes of the material furnished and indicate full compliance with all applicable specification and contract requirements. Transcription of certification data is prohibited. 3.24.5 Statements on material certification documents must be positive and unqualified. Disclaimers such as “to the best of our knowledge” or “we believe the information contained herein is true” are not acceptable. 3.24.6 If material is received without the required certification papers or with incorrect/missing data on the certification papers, the material will be rejected. 3.25 Material Handling. The written material control process must include the following: All raw materials must have traceability markings (except as specified below). Stored raw materials requiring traceability must be segregated to preclude intermingling with materials not requiring traceability. When traceability markings will be removed by a manufacturing or fabrication process, the marking must be recorded prior to removal and be immediately restored upon completion of the process. If this cannot be done or is impractical, an appropriate material control procedure (such as a bag and tag, tagging, and/or tote box control) must be employed. The material control procedure must provide a method of positive control to preclude commingling of heats/lots or loss of traceability. The traceability marking must be reapplied upon completion of the final manufacturing process. Brazing or weld filler metals for strength welds forming or integral with pressure containing components or assemblies requiring traceability must be verified to be the correct material, and type or grade, as applicable, prior to consumption. At a minimum, material verification must consist of inspection of material test reports for conformance to specified requirements. Control of welding and brazing filler metals must be maintained to the point of consumption to assure use of the correct type and grade. Markings and traceability requirements do not apply to brazing and weld filler metals after consumption. It is the responsibility of the prime contractor to ensure conformance with the above requirements on welds performed by their subcontractors. Purchase orders for raw material must specify that the material be traceable to material certification test reports by traceability markings on the material and identified on the test reports. The certification data requirements contained in DI-MISC-81020 must be invoked by the prime contractor on all subcontractors supplying Level I material. The material control process must include requirements for the maintenance of traceability for items sent out for subcontracted operations. If such operations would remove traceability markings, purchase or work orders must specify a method and marking location for remarking. The contractor must also ensure that subcontractor production controls are adequate to preclude commingling of materials during processing. 3.26 Receiving Inspection 3.26.1 Products and services produced by sub-tier suppliers for incorporation in the contract end item must be subject to inspection or audit at the time of receipt by the prime prior to further processing within the prime contractor's plant or shipment to another location. 3.26.2 Receiving Inspection must include as a minimum: Verification that the traceability marking on the material agrees with that on the certification test reports. Verification that certification test reports are legible and complete. Verification that the contents of the certification test reports are in compliance with the contractually invoked specifications and requirements. 3.27 Discrepancy Reporting 3.27.1 Nonconforming products must be identified and processed in accordance with the prime contractor's procedures for controlling nonconforming products. The prime contractor must report the receipt of any nonconforming products to the responsible sub-tier supplier in accordance with established procedures. Nonconforming material records will be maintained and available for review by the government Quality Assurance Representative (QAR). 3.28 Final Inspection. The following inspections must be performed prior to Government inspection and acceptance. 3.28.1 Material Sampling. Material must be inspected for form, fit, and function. Lot acceptance must be based on zero defects and lot rejection based on one defect. The sample size must be in accordance with the sampling plan(s) in the applicable military specification or standard, federal specification or standard, or drawing to which the material was manufactured. In the absence of such sampling plans, sampling inspection must be per ANSI/ASQ-Z1.4, general inspection level II (for sample size selection code), table IIA (for sample size). Small Lot Sizes: For lot sizes of fifty or less, the minimum sample size must be eight units. For lot sizes of eight or less, the sample size must be one hundred percent of the lot. 3.28.2 The Manufacturer may elect to use Statistical Process Control (SPC) to assure product quality in lieu of the above attribute sampling plan, provided that the SPC methodology/system used provides acceptable products to the Government. However, the Government/Navy Receipt Inspection Activity may perform their acceptance inspection of the material using the attribute sampling plan outlined above. 3.28.3 All data concerning material verification (chemical, mechanical or physical properties), traceability (material certifications to material marking), and nondestructive test (NDT) certifications for material must be 100% inspected. The certification test reports must also be 100% inspected for completeness and legibility. 3.28.4 All material...