Opportunity

South Carolina Sfaa Sfaa #5400030328

Design, supply, and installation of a light tunnel with Oligo Surface Controls lighting

Posted

October 14, 2026

Respond By

November 02, 2026

Identifier

5400030328

NAICS

238210, 335132, 332323

The South Carolina Technical College System is seeking a complete light tunnel for the Scout Motors Training Center. - Buyer: State of South Carolina, South Carolina Technical College System, Procurement Office. - Scope: Design, furnish, and install a light tunnel, including its frame, lighting, and controller. One service line item covers the work; product quantities are not stated. - Named OEM: Oligo Surface Controls products are specified, or equivalents: - HST1.2 manual lighting controller. - LPS100 puremaxLED lighting panels. - Frame: Non-corrosive metal, with stated dimensions of 30 × 96 × 204 (units are not specified); design must allow movement around the vehicle. - Lighting requirements: At least 1,000 lux in the central floor zone; LED assemblies with two 6500K daylight lamps and one 4000K neutral or cool-white lamp. Panels are specified as 33.86 × 61.42 × 3.94 (units are not specified), with anticipated spacing of 8–12 (units are not specified). Requirements also include analog dimming, non-plastic housing, safety glass, IP54, Class I, and UGR limit 19. - Controller requirements: 0–100% display, three analog outputs, capacity for up to 210 surface-control optics, and IP54/Class I protection. - Notable requirement: Plans for the structure and mechanical layout must be approved before construction and installation. No quantities for panels or controllers, performance period, or named vendor are provided.

Description

The South Carolina Technical College System is seeking bids for the Scout Light Tunnel. This is an Invitation for Bid with offers due November 2, 2026, at 10:00 AM. A site visit is scheduled for October 22, 2026, at 1500 Scout Motors Drive in Blythewood, South Carolina, and a pre-bid conference is scheduled online for October 23, 2026. Questions must be received by October 26, 2026, at 10:00 AM.

View original listing