Opportunity

Pennsylvania eMarketplace #OSM 11,65(0948,4371)101.1

Reclamation, earthwork, coal refuse disposal, and erosion-control construction in Cambria and Westmoreland Counties

Posted

October 16, 2026

Respond By

November 12, 2026

Identifier

OSM 11,65(0948,4371)101.1

NAICS

237990, 562910

The Pennsylvania Department of Environmental Protection is seeking reclamation, earthwork, and erosion-control construction in Cambria and Westmoreland Counties. - Government buyer: Pennsylvania Department of Environmental Protection (Pennsylvania DEP); no sub-agency or office is specified. - Scope and quantities: - Site work: Clear and grub 23.4 acres; grade 122,489 cubic yards; rip 14.4 acres; prepare 23.4 acres for planting; and construct one lump-sum access road. - Erosion and drainage work: Install 2 rock construction entrances with wash racks, 5,912 linear feet of 32-inch compost filter sock, 351 linear feet of weighted sediment filter tube, 4,520 linear feet of subsurface drain, 1,626 cubic yards of permanent channel excavation, 4,642 square yards of erosion matting, and a 231-square-foot stilling basin. - Planting: Provide 9,790 tree seedlings and 713 pounds of grass seed. - Materials and refuse: Provide 270 tons of AASHTO No. 8 aggregate, 104 square yards of R-4 rock, and 312 square yards of filter fabric; dispose of 44,073 cubic yards of coal refuse; and coordinate, supply, deliver, and place 24,628 tons of coal ash. The access road also requires 100 tons of maintenance stone. - Other work: Provide one lump-sum Type A construction surveying service. - OEMs and vendors: No manufacturers, OEMs, or vendors are identified in the notice. - Notable requirement: The work combines large-volume grading and reclamation with coal refuse disposal and coal ash coordination, delivery, and placement.

Description

The solicitation seeks construction work in Cambria and Westmoreland Counties, with the listed work including erosion and sediment controls, clearing and grading, planting, drainage, coal refuse disposal, and coal ash supply, delivery, coordination, and placement. Other items include permanent channel excavation, erosion matting, an access road, and construction surveying. The stated duration is 720 calendar days. Bid documents are available through BidExpress.com.

View original listing