Opportunity
Utah Public Procurement Place U3P #2026-031
Structural geopolymer lining and maintenance for three South Jordan culvert chambers
Posted
October 14, 2026
Respond By
October 28, 2026
Identifier
2026-031
NAICS
237110, 237990
The City of South Jordan is seeking a contractor to rehabilitate three Daybreak culvert chambers with structural-grade geopolymer lining. - Buyer: City of South Jordan, Utah; Engineering office. - Scope: Consult on, prepare for, and install approximately 1,680 linear feet of spray-applied lining. Chamber 2 is the base bid; Chambers 3 and 1 are alternative bids. - Lining quantities: Chamber 2 — 310 feet; Chamber 3 — 350 feet; Chamber 1 — 1,020 feet. Plans identify the chambers as 96-inch non-perforated corrugated metal pipe and provide approximate interior areas: Chamber 1 — 24,800 sq. ft.; Chamber 2 — 7,900 sq. ft.; Chamber 3 — 900 sq. ft. - Related work: Mobilization and temporary facilities, site preparation and debris removal, traffic and dust control, land disturbance permit and stormwater plan measures, and landscaping restoration for each chamber. - Key requirements: Use an approved monolithic spray-applied, high-build geopolymer system for internal protection and full structural rehabilitation, with a minimum 50-year service life and corrosion and abrasion protection. The City will provide CCTV inspection footage. - OEMs and vendors: No lining manufacturer, OEM, or contractor is named. The procurement refers generally to applicable manufacturer standards and specifications. - Schedule: Notice-to-proceed timing varies by schedule; all work and invoicing must be completed by the stated project deadline. No overall contract duration or option periods are specified.
Description
The City of South Jordan seeks proposals for spray-applied structural-grade geopolymer lining services for its culvert maintenance projects. The contractor will provide consultation, materials, labor, and equipment, and prepare and install approximately 1,680 linear feet of lining designed for a minimum 50-year service life and structural rehabilitation. Work includes lining at Chambers 1, 2, and 3, with a base bid for Chamber 2 and alternative bids for Chambers 3 and 1; performance and payment bonds are required. Proposals are due online through Bonfire by October 28, 2026, and project completion, including invoicing, is required by June 1, 2027.