Opportunity

Utah Public Procurement Place U3P #2026-031

Structural geopolymer lining and maintenance for three South Jordan culvert chambers

Posted

October 14, 2026

Respond By

October 28, 2026

Identifier

2026-031

NAICS

237110, 237990

The City of South Jordan is seeking a contractor to rehabilitate three Daybreak culvert chambers with structural-grade geopolymer lining. - Buyer: City of South Jordan, Utah; Engineering office. - Scope: Consult on, prepare for, and install approximately 1,680 linear feet of spray-applied lining. Chamber 2 is the base bid; Chambers 3 and 1 are alternative bids. - Lining quantities: Chamber 2 — 310 feet; Chamber 3 — 350 feet; Chamber 1 — 1,020 feet. Plans identify the chambers as 96-inch non-perforated corrugated metal pipe and provide approximate interior areas: Chamber 1 — 24,800 sq. ft.; Chamber 2 — 7,900 sq. ft.; Chamber 3 — 900 sq. ft. - Related work: Mobilization and temporary facilities, site preparation and debris removal, traffic and dust control, land disturbance permit and stormwater plan measures, and landscaping restoration for each chamber. - Key requirements: Use an approved monolithic spray-applied, high-build geopolymer system for internal protection and full structural rehabilitation, with a minimum 50-year service life and corrosion and abrasion protection. The City will provide CCTV inspection footage. - OEMs and vendors: No lining manufacturer, OEM, or contractor is named. The procurement refers generally to applicable manufacturer standards and specifications. - Schedule: Notice-to-proceed timing varies by schedule; all work and invoicing must be completed by the stated project deadline. No overall contract duration or option periods are specified.

Description

The City of South Jordan seeks proposals for spray-applied structural-grade geopolymer lining services for its culvert maintenance projects. The contractor will provide consultation, materials, labor, and equipment, and prepare and install approximately 1,680 linear feet of lining designed for a minimum 50-year service life and structural rehabilitation. Work includes lining at Chambers 1, 2, and 3, with a base bid for Chamber 2 and alternative bids for Chambers 3 and 1; performance and payment bonds are required. Proposals are due online through Bonfire by October 28, 2026, and project completion, including invoicing, is required by June 1, 2027.

View original listing