Opportunity
Georgia Procurement Registry #PE-77465-NONST-2027-000000018
Cadwell, Georgia sidewalk removal, replacement, and related construction
Posted
October 14, 2026
Respond By
November 04, 2026
Identifier
PE-77465-NONST-2027-000000018
NAICS
237310
Laurens County is seeking a contractor to replace and extend sidewalks and complete related site work in Cadwell, Georgia. - Buyer: Laurens County Board of Commissioners; project location is the City of Cadwell, Laurens County, Georgia. - Scope: Remove existing 4-foot-wide sidewalks and build new 5-foot-wide, fiber-reinforced, 3,000 PSI concrete sidewalks on Coleman and Walnut Streets. New sidewalk sections are specified as 4 inches or 6 inches thick. - Base bids cover sidewalk work on two sections of Coleman Street and one section of Walnut Street, including one water valve cover replacement. - Bid options cover additional sidewalk removal on Walnut, Coleman, and Snowhill Streets, plus grading and seeding, driveway aggregate bases, four Type D handicap ramps, compaction testing, and miscellaneous work. - Related work includes providing labor, equipment, materials, grading, smooth driveway transitions, traffic control, and construction signs. Work must meet applicable DOT sidewalk requirements and MUTCD traffic-control requirements. - Payment is based on installed quantities, with unit prices required. The contractor is responsible for the required construction bonds, insurance, and E-Verify compliance. - OEMs and vendors: No manufacturers, OEMs, or vendors are named. This is a construction-services procurement, not a branded-product purchase.
Description
Laurens County is seeking bids to remove and replace sidewalks along various streets in the City of Cadwell. Work includes replacing existing 4-foot sidewalks with new 5-foot concrete sidewalks, removing designated sidewalk areas and grading and grassing those areas, and related work such as driveway transitions and traffic control. The project includes base bids and optional work on Coleman, Walnut, and Snowhill Streets, with construction required to meet applicable Department of Transportation guidelines. The contractor must complete the project by March 1, 2027; payment and performance bonds and specified insurance and compliance documents are required.