Opportunity

Georgia Procurement Registry #PE-66062-NONST-2027-000000503

Consultant design services for Phase I of the PATH Lakewood shared-use trail

Posted

October 14, 2026

Respond By

October 30, 2026

Identifier

PE-66062-NONST-2027-000000503

NAICS

541330, 541370, 541320

The City of Atlanta is seeking a consultant team to design the first phase of a paved shared-use trail connecting two parts of its trail network. - Government buyer: City of Atlanta, through the Atlanta Department of Transportation (ATLDOT); the project is in Fulton County, Georgia. - Project partner: PATH Foundation. No manufacturers or prospective vendors are identified in the opportunity. - Requested services: - Project management, coordination, quality control, cost estimating, and validation or revision of the approved concept report. - Data collection and analysis, followed by preliminary design for transportation, roadway, bridge, trail, accessibility, right-of-way, utility, and related conditions. - Final design and preparation of construction plans, including roadway, signing and marking, traffic signal, and utility plans. - Environmental screening, surveys, NEPA documentation, and permitting support, with the goal of qualifying for a Categorical Exclusion. - Public and stakeholder engagement, including coordination with PATH Foundation, public events, an open house, and a summary of input. - Phase I limits: Southside Trail to Pryor Road at Meldon Avenue. The broader planned connection links the Southside Beltline Trail to the Southtowne Trail at South Bend Park. - Notable requirements: Designs must follow applicable GDOT plan-development and design requirements and City standards, incorporate stakeholder input, and address pedestrian, bicycle, and disability access and safety. The prime consultant must have current GDOT prequalification in roadway design, bicycle and pedestrian facility design, minor bridge design, construction engineering and supervision, and erosion, sedimentation, and pollution control. The prime and subconsultant team must collectively cover the specified qualifications for NEPA and environmental disciplines; historical resources and archaeology; traffic analysis and operations; roadway, trail, landscape, bridge-foundation, and erosion-control work; railroad and utility coordination; surveying; aerial photography; and subsurface utility engineering. - Deliverables: Validated or revised concept report, preliminary and final design plans, NEPA documentation, right-of-way plans, construction plans, cost estimates, and an engagement summary.

Description

The City of Atlanta is seeking a qualified consultant to design Phase I of a paved shared-use path connecting the Southside Beltline Trail to the Southtowne Trail at South Bend Park. Phase I extends from the Southside Trail to Pryor Road at Meldon Avenue. Services include validating or updating the concept report, preparing preliminary and final design plans, completing NEPA documentation, and supporting permitting and public and stakeholder engagement. The work includes project management, data collection and analysis, right-of-way and utility coordination, environmental screening, and producing construction plans for letting.

View original listing