Opportunity
SAM #36C26027R0014
VA domestic water system correction construction at Mann-Grandstaff VA Medical Center
Buyer
Vanco 20
Posted
October 14, 2026
Respond By
November 23, 2026
Identifier
36C26027R0014
NAICS
236220, 238210, 562910, 238220
The Department of Veterans Affairs is soliciting construction to correct domestic-water-system deficiencies at Mann-Grandstaff VA Medical Center in Spokane, Washington. - Government buyer: Department of Veterans Affairs (VA), VA Spokane Healthcare System / Veterans Health Administration; Mann-Grandstaff VA Medical Center. The construction documents also identify the Office of Construction and Facilities Management. - Project: 668-22-106, covering Buildings 1 and 12. The estimated project magnitude is $1 million to $10 million. The procurement is a 100% Service-Disabled Veteran-Owned Small Business set-aside. - Scope: Modify existing hot- and cold-potable-water distribution systems, remove dead legs, replace or install plumbing and monitoring components, and complete associated electrical work. General construction, demolition, and specified asbestos/lead remediation are also included. - Named OEMs and products: Chicago Faucets HyTronic touchless automatic-flushing faucets and Commander programming unit; Pall AquaSafe filters; Phigenics water-monitoring panels and Diagnostic Exchange equipment; Belimo temperature sensors; Trerice programmable pressure transmitters; Watts check valves and LFUSG-B under-sink mixing valves; and Armstrong Veris Accelabar flow meters. Models, scheduled quantities, and locations are detailed in the line items below; some schedule entries do not state quantities. - Other named company: Northeast Infrastructure, LLC is identified as the Architect-Engineer, not as an OEM or product supplier. - Notable requirements: Field verification; coordination of shutdowns and affected areas; commissioning, startup, testing, functional-performance verification, and training; O&M documentation and manuals; and twice-weekly potable-water fixture flushing after sanitization until beneficial-occupancy acceptance. Materials and installation carry a one-year warranty. The specifications estimate asbestos pipe-insulation abatement quantities; those quantities are estimates. - Performance: Complete work within 275 calendar days after Notice to Proceed. No option years are stated. The solicitation includes two deduct alternates that may omit specified sensor work or specified Building 12 work.
Description
Correct Domestic Water System