Opportunity

San Diego County Ivalua #BPM012786

CMAR services for East Mesa Juvenile Detention Facility housing-unit upgrades and lock replacements

Posted

October 13, 2026

Respond By

December 04, 2026

Identifier

BPM012786

NAICS

236220

San Diego County is seeking a construction manager at risk for upgrades to housing units at the East Mesa Juvenile Detention Facility. - Government buyer: County of San Diego, Department of General Services; Department of Purchasing and Contracting. - Procurement: Construction Manager at Risk (CMAR) services for East Mesa Juvenile Detention Facility Upgrades, Part 2 / Softening Project Expansion (RFP 12786; Project MP26106). - Base scope: Upgrade four housing units with new wall, ceiling, and floor finishes, furniture, lighting, and remodeled showers and toilets. - Contract Option 1: Replace 50 key/pneumatic, 20 key/card-reader, and 20 key-only lock assemblies. The locks must integrate with the existing Back Creek Security System; no lock part numbers or lock manufacturer are identified. - CMAR services: Preconstruction work includes validating existing conditions, design and constructability reviews, cost estimating, scheduling, procurement recommendations, value engineering, and preparation of a Guaranteed Maximum Price (GMP). Construction is optional and proceeds only if authorized by the County after GMP acceptance. - Notable requirements: The solicitation materials specify at least 3% Small-Local Business subcontractor participation. Available project information includes asbestos/lead surveys; the lead survey reports no samples classified as lead-based paint. - Budget information: Attachment summaries give differing not-to-exceed figures: $7,500,000 for the softening project and $8,300,000 for the base scope plus Contract Option 1. These are reported as distinct document figures. - Named organizations and systems: Davy Architecture prepared design development drawings; it is not identified as a proposed contractor or product manufacturer. Back Creek Security System is the existing system for lock integration. No lock OEM is specified.

Description

The County of San Diego is requesting proposals from qualified firms to provide Construction Manager at Risk services for the preconstruction and construction phases of East Mesa Juvenile Detention Facility (EMJDF) Upgrades, Part 2. The project includes a base scope and, at the County’s discretion, one or more contract options; preconstruction includes collaboration on existing conditions, design, constructability, cost, and schedule, and development of a Guaranteed Maximum Price for construction. Construction may proceed at the County’s option after it accepts the GMP. The stated current estimated budget not to exceed, including the base scope and Contract Option 1, is $8,300,000.

View original listing