Opportunity
Massachusetts COMMBUYS #BD-27-1042-ENVOP-FAC01-134390
Repair and regrade dirt access road at Burrage Pond Wildlife Management Area
Posted
October 13, 2026
Respond By
November 05, 2026
Identifier
BD-27-1042-ENVOP-FAC01-134390
NAICS
237310, 238910, 237990
Massachusetts EEA seeks a contractor to restore a dirt access road at Burrage Pond Wildlife Management Area. - Government buyer: Commonwealth of Massachusetts, Executive Office of Energy and Environmental Affairs (EOEEA), EEA Facilities / Operations. - Location and scope: Repair, regrade, and improve about 1,520 linear feet of existing road, averaging 10 feet wide, at Burrage Pond Wildlife Management Area in Hanson. - Work and materials: Prepare and reshape the roadway, improve drainage, and place and compact approximately 2–3 inches of processed gravel meeting MassDOT gravel borrow specifications or an approved equivalent. Estimated treatment area is about 15,200 square feet. - Key requirements: Restore a crowned road surface with an approximately 4%–6% cross slope; address potholes, washouts, and rutting; and leave the road stable, well-drained, and suitable for authorized all-weather vehicle access. Protect wetlands, wildlife habitat, vegetation, and other natural resources, including through erosion and sediment controls. - Delivery: The contractor provides all labor, materials, equipment, supervision, transportation, and incidentals. A final walkthrough with the EEA Project Manager is required. - OEMs and vendors: No OEMs, manufacturers, or contractor vendors are named. MassDOT is cited as the gravel specification reference, not as a supplier.
Description
The Commonwealth of Massachusetts, through EEA Facilities, seeks a qualified contractor to repair, regrade, and improve an existing dirt access road at 11 Hawk Avenue in Hanson, within the Burrage Pond Wildlife Management Area. Work covers approximately 1,520 linear feet of roadway with an average travel width of 10 feet and includes roadway preparation, regrading, gravel placement and compaction, and drainage improvements. The contractor must protect adjacent environmentally sensitive land and complete a final walkthrough with the EEA Project Manager. Proposals and questions must be submitted electronically through COMMBUYS; a mandatory site visit is specified in the statement of work.