Opportunity
Brazos Valley Ionwave #27-003
Tabor Pump Station pump, electrical, and flow-meter improvements
Posted
October 12, 2026
Respond By
November 03, 2026
Identifier
27-003
NAICS
237110, 237120
The City of Bryan is seeking construction proposals to upgrade the Tabor Pump Station’s pumping, electrical, metering, and related site systems. - Government buyer: City of Bryan, Texas — Engineering Department. CDM Smith is identified as the project designer. - Project scope: Demolish existing mechanical and electrical equipment and construct pump-station improvements, including pump installation, electrical upgrades, instrumentation and controls, and associated civil and structural work. Stormwater controls, traffic control, permitting, and trench safety systems are also included. - Products and quantities: - One vertical turbine pump and motor, identified as Pump No. 8, installed in an existing can. - Redundant primary metered utility service and transformers stepping voltage down to 4,160 V; quantity not specified. - One two-source medium-voltage metal-clad switchgear assembly and one medium-voltage motor control center with auxiliary equipment. - Four insertion-type magnetic flow meters and four external access vaults. - OEMs named as acceptable manufacturers: - Pump: Flowserve; Fairbanks Nijhuis Pentair; Xylem Goulds; Floway; Sulzer. - Switchgear: Eaton; Siemens Industry Inc; Square D, Schneider Electric; GE by ABB. - Motor control center: Eaton; Square D, Schneider Electric; Robicon, Siemens; Rockwell Automation. - Flow meters: ABB Instrumentation; McCrometer FPI; Torpee-Mag. No part numbers are provided. - Other bid-schedule work: Pump-station construction and electrical improvements; pump and motor installation; flow-meter vault and meter installation; and 160 linear feet of trench excavation safety systems for trenches deeper than five feet. An additive alternate requests physical-model services for the pump in the existing can and suction-header configuration. - Notable requirements: Integrate instrumentation and controls for the pump, electrical feed, meters, and related equipment; provide redundant utility service; and install the four meters in external access vaults. The stated estimated construction budget is $7.5 million. - Schedule: The stated performance period is 450 working days from Notice to Proceed. The documents indicate a target completion within that period; no option years or annual subscription are specified. - Document references: The materials identify City Project No. 611-D6-2423 and cite differing RFP identifiers, 27-003 and 26-035.
Description
The City of Bryan is requesting proposals for pump station and electrical improvements at Tabor Pump Station. Work includes demolition of existing mechanical and electrical equipment; installation of a new vertical turbine pump, redundant utility service and transformers, switchgear, motor control center, flow meters, and instrumentation and controls. The project also includes related structural and civil work, stormwater measures, traffic control, and construction permitting. Proposals are due November 3, 2026, at 2:00 PM CT, and electronic and written submissions must be received by the deadline.