Opportunity

South San Francisco Opengov #pf 2306; Bid 2725

Construction of South San Francisco Fire Station 63 and Site Improvements

Posted

October 12, 2026

Respond By

November 13, 2026

Identifier

pf 2306; Bid 2725

NAICS

236220, 238290

The City of South San Francisco is seeking bids to build Fire Station 63 and deliver associated site, building-systems, and equipment work. - Government buyer: City of South San Francisco, Capital Projects department. - Project: Construct one approximately 10,150-square-foot, two-story fire station at 71 Camaritas Avenue, including a three-bay apparatus garage, six firefighter dormitories, shared living and operational areas, and a historic fire-engine display area. - Site and building work: Grading, paving, utilities, stormwater treatment, accessible paths, parking, landscaping and irrigation, fencing, gates, lighting, and structural, architectural, mechanical, plumbing, electrical, standby-power, fire-protection, communications, audiovisual, and security systems. - Notable infrastructure: One 450 kW emergency generator and one fuel storage tank with associated fuel storage and dispensing systems; one EV charging station and four future EV-capable parking rough-ins; one designated area for a future battery energy storage system; and photovoltaic-ready areas. - Equipment and named manufacturers/vendors: Drawings identify products from Street Furniture (ARIA Seat), Madrax (Orion bicycle rack), SiteOne (irrigation controller assembly), Febco (825YA backflow assembly), EZ-Flo (EZ-010-FX fertilizer injector), Rain Bird (XBD-80 emitter manifold), GE Profile (PEB7227SLSS microwave), Wolf (IR48751/S/P range and PW482418 hood), Lamber / Eurodib (F99DYPS dishwasher), GE (GFW430SSMWW washer and GFD43ESSMWW dryer), Bunn (AXIOM 38700.0011 coffee maker), Traeger (pellet grill, model TBD), Sony (BRAVIA XR8B televisions), TrueForm (T5X treadmill), Matrix (alternate treadmill), Rogue (Echo Bike V3.0 and RML-490 power rack), Concept2 (BikeErg and RowErg-PM5), and Larsen (FS 2409-R3SS and FS 2409-R1SS extinguisher cabinets). A Model 19 fire pole and numerous landscape plants are also shown; no manufacturer is specified for the fire pole. - Selected quantities: One each of the generator, EV charging station, fuel tank, monument sign, fire pole, listed kitchen/laundry equipment, televisions, and most gym equipment; four future EV-capable parking rough-ins; two bicycle racks; 29 Leucadendron ‘Safari Sunset’; 77 Lomandra ‘LM600’; and 15 Muhlenbergia capillaris. Some drawing quantities are not specified, including the bicycle locker, some plantings, and several irrigation components. - Other notable requirements: Fire sprinkler and alarm systems, emergency responder radio communications, hydrants and underground fire services; fuel leak detection, emergency shut-off and monitoring; communications cabling, audiovisual distribution, surveillance, intercom, access control and intrusion detection. Some appliances are identified as owner-furnished and contractor-installed. - Qualification and bid conditions: Bidders must hold a valid California Class B Contractor’s License, be prequalified and shortlisted by the City, attend the mandatory pre-bid meeting and site walk, and submit a bid bond. The project is locally funded.

Description

The City of South San Francisco is soliciting bids for construction of a new approximately 10,150-square-foot, two-story Fire Station 63 on an approximately 1.07-acre site at 71 Camaritas Avenue. The work includes the station and its apparatus garage, firefighter living quarters, and associated site, utility, stormwater, parking, accessibility, landscape, lighting, mechanical, plumbing, electrical, fire protection, communications, and security improvements. A valid California Class B Contractor’s License is required, and only general contractors prequalified and shortlisted by the City through the stated prequalification process may bid. Attendance at the October 19, 2026 pre-bid meeting and site walk is mandatory, and a bid bond is required.

View original listing