Opportunity

Laguna Beach Planet bids #PW-26-033

Old Top of the World Lift Station Phase II Rehabilitation

Posted

October 09, 2026

Respond By

November 10, 2026

Identifier

PW-26-033

NAICS

237110

The City of Laguna Beach is seeking a contractor to rehabilitate the Old Top of the World Lift Station while keeping sewer service operational. - Government buyer: City of Laguna Beach, Public Works Department. - Project: Phase II rehabilitation of the existing lift station in Laguna Beach, California. The estimated project value is $700,000. - Major equipment and named OEMs: Cummins C30 N6 natural-gas standby generator (30 kW); Myers NP 3102 submersible pump; and equipment specified by Olson, Jensen, Greenheck, Honeywell, MSA Safety, Kinetics, Dwyer, Sika, and Ruskin, with “or equal” alternatives permitted where specified. Other named product sources include USF Fabrication, EJCO, Zebron, and Armorock. - Products and quantities: One each of the generator, submersible pump, sump pump, flood switch, exhaust fan, heavy-duty limit switches, oxygen/carbon monoxide detector, methane detector, differential pressure switch, soundproofing panels, generator-vault intake and exhaust louvers, precast wet-well and generator-vault lids/access covers, decorative screening fence with three gates, and related electrical, piping, ventilation, coating, and safety components. Product details and part numbers are listed below where provided. - Construction services: Civil, mechanical, structural, electrical, and controls work; demolition and disposal of existing equipment; vault and wet-well cleaning and repairs; concrete work, earthwork, protective coatings, landscaping restoration, testing, training, and closeout documentation. Dewatering is a deletable bid item. - Notable requirements: Maintain lift-station operations and protect existing facilities; keep Sommet du Monde accessible to emergency vehicles; coordinate utility and communications work with Southern California Edison, Southern California Gas Company, Cox Communications, and Frontier. The specified generator is a natural-gas standby unit designed for NFPA 110 Level 1 systems. Deferred submittals are required for the screening fence and precast lids. - Performance: The stated project duration is 140 working days. No option periods or annual subscription are stated.

Description

The City is seeking bids for Phase II rehabilitation of the existing Old Top of the World Lift Station in Laguna Beach. Work includes civil, mechanical, structural, electrical, and controls improvements; equipment installation; modifications to concrete lids, access hatches, fencing, and associated systems; protective coatings; and generator vault soundproofing. The contractor must coordinate with the City, maintain lift station operations, protect existing facilities, and preserve emergency vehicle access on Sommet du Monde throughout construction. The estimated value is $700,000, and the stated duration is 140 working days.

View original listing