Opportunity
Harmony Public Schools Ionwave #HPS2026AuditoriumConvert Addendum 1
Harmony Public Schools auditorium-to-cafeteria renovation with kitchen and building-system modifications
Posted
September 03, 2026
Respond By
October 22, 2026
Identifier
HPS2026AuditoriumConvert Addendum 1
NAICS
236220, 238210, 238220, 238290, 238310, 238320, 238330, 238390, 238910
Harmony Public Schools is seeking a complete renovation to turn Harmony School’s auditorium in El Paso into a cafeteria/cafetoruim, with kitchen and building-system modifications. - Buyer: Harmony Public Schools (HPS), Expansion & Construction Department; contact listed as Hayati Ugur. Project location: Harmony School, El Paso, Texas. - Scope: Renovate approximately 1,000 square feet, convert the auditorium, and relocate two existing serving lines. Work includes demolition, building trades and finishes, kitchen alterations, fire suppression, HVAC, plumbing, electrical, communications, safety and security, earthwork, utilities, and related testing, inspections, and coordination. - Flooring: Retain existing flooring in the base bid; separately price quarry tile replacement if required by the Health Department. Any replacement would require authorization after award. - Kitchen details: Plans identify a roll-up grill, stainless-steel tray rail, new handwash sink, and step. Movable kitchen equipment is identified as owner-provided; the equipment schedule is listed below for completeness and does not establish that these items are being purchased. - OEMs named in the equipment schedule: True, Trausler, Universal, Metro, Cres Core, Vulcan, and Beverge Air (spelled this way in the attachment). No part numbers are provided. - Notable site requirement: The school will be occupied; disruptive or noisy work must take place after school hours, on weekends, or during school holidays. Fire alarm design is by a contractor-hired third party under a separate permit. - Period of performance: Not stated in the available materials.
Description
Harmony Public Schools is seeking proposals to convert an auditorium space into a cafeteria/cafetorium. The project summary states that two existing serving lines are to be relocated into the auditorium; the bid package includes associated construction work and drawings across architectural, plumbing, electrical, and mechanical disciplines. Existing flooring is to remain in the base bid, with quarry tile replacement priced as an alternate if required by the Health Department. Proposals are due October 22, 2026, at 3:00 PM CT.