Opportunity

Garland Ionwave #REQ00003230

Oates Road Substation fabricated steel structures and anchor assemblies

Posted

October 09, 2026

Respond By

October 29, 2026

Identifier

REQ00003230

NAICS

332312

The City of Garland’s Garland Power & Light is seeking custom-fabricated steel and anchor assemblies for the Oates Road Substation rebuild in Garland, Texas. - Buyer: City of Garland — Garland Power & Light (GP&L), Procurement & Contract Administration; Teresa Smith, Purchasing Manager. - Procurement: Fabricated steel structures and associated anchor cages/assemblies for a 138-kV substation, plus a 12.47-kV air-switch support and a fabricated switch spacer. - OEMs and vendors: No steel manufacturer, OEM, or supplying vendor is identified. The named government entities and representative are City of Garland, GP&L, and Teresa Smith. - Notable requirements: Proposed fabricator must have a factory in the continental United States within 1,200 miles of Garland and provide project engineering through a U.S.-registered professional engineer. Parts and materials require a five-year warranty. Pricing and lead times are required; the supplier must allow two weeks for owner review of approval drawings and provide a detailed drawing-and-delivery schedule within three weeks after receiving the purchase order. - Delivery: All materials are required by the stated delivery deadline; no separate contract term or option years are provided. - Scope and drawing references: Twenty-seven physical material items are listed below. Fabricated structures are generally to include columns, cross arms, base plates, equipment mounting, protective coatings, connection assemblies, and incidentals; anchor assemblies include anchor bolts, templates, and hardware. The listed OR drawing references identify the specified configurations.

Description

The City of Garland is seeking bids for steel structures and anchor assemblies for the Oates Substation project in Garland, Texas. The project involves rebuilding the existing 138-kV substation, with steel structures supporting bus, switches, and other equipment, as well as line termination structures. Bidders must submit pricing for the specified materials and complete the required bid sheet and steel fabricator questionnaire; a five-year warranty is required for parts and materials. The required delivery date is September 6, 2027.

View original listing