Opportunity

Utah Public Procurement Place U3P #FAC25022

Art Barn accessibility, gallery renovation and building systems improvements

Posted

October 09, 2026

Respond By

October 28, 2026

Identifier

FAC25022

NAICS

236220, 238210

Salt Lake City is seeking construction services to improve accessibility and renovate the Finch Lane Art Gallery, also known as the Art Barn. - Government buyer: Salt Lake City Corporation, Department of Public Services; Architecture & Construction Management Division (ACM Division). - Project: Art Barn Accessibility and Infrastructure Improvements, project FAC25022, at 54 Finch Lane, Salt Lake City. - Construction scope: Improve the main entry and accessible north entrance; remove the existing interior ramp; remodel storage and administration areas; install gallery hardwood flooring, office carpet, ceiling panels, lighting and casework; and modify related electrical and mechanical systems, including HVAC. - Specified products and OEMs: Lithonia 4-foot LED wrap; Juno single-circuit track in 10-, 16-, 32- and 45-foot lengths and 3-inch track heads; Spitzer 10-inch wall luminaire; a wireless door operator; wireless lighting controls; acoustic ceiling panels; built-in cabinet with Doug Mockett tab pulls; and a Country Casual Teak Strata 5-foot backless bench, or equal. No quantities are specified. - Notable requirements: Maintain access to the existing ADA parking stall during construction, coordinate work and installations with existing conditions and other trades, and provide the electrical connections and track components needed for the specified installations. - Performance period: Not stated; duration, option years and subscription terms are not identified.

Description

Salt Lake City Corporation is seeking bids for general improvements to the art exhibit gallery space at the Art Barn. Work includes renovating the main entry, removing the existing ADA ramp and relocating the ADA entrance to the north door, remodeling a storage closet and administration offices, installing hardwood gallery flooring, carpet, ceiling tile and exhibit lighting, and painting. The project also includes modifications to electrical and mechanical systems related to the gallery and office renovations. Required bid uploads include a bid bond, bid form, bid schedule, and value program form.

View original listing