Opportunity

SAM #SLAC_DRAFT_RFP_369005_CRMF_Cleanroom_Construction

CRMF ISO Class 4 Cleanroom Construction with Optional Ultra-Pure Water System

Buyer

SLAC National Accelerator Laboratory

Posted

October 09, 2026

Respond By

October 24, 2026

Identifier

SLAC_DRAFT_RFP_369005_CRMF_Cleanroom_Construction

NAICS

236220, 238220, 238210

SLAC National Accelerator Laboratory is seeking a qualified contractor to build and commission a specialized cleanroom in its Cryomodule Repair and Maintenance Facility. - Buyer and opportunity: The U.S. Department of Energy’s Office of Science, through SLAC National Accelerator Laboratory (operated by Stanford University), is procuring construction through SLAC Supply Chain Management. The project is a firm-fixed-price subcontract; the notice is a sources-sought/solicitation package, not an award. - Base scope: Build and turn over an approximately 2,200-square-foot cleanroom support area, including approximately 1,100 square feet of ISO Class 4 cleanroom space, inside the existing CRMF building. Work includes procurement and fabrication, construction, utility connections, contamination control, testing, commissioning, certification, cleanup, and closeout documentation. - Optional scope: Install an Ultra-Pure Water (UPW) system beside the cleanroom. The option includes utility connections and acceptance data; it may or may not be exercised. - Specified equipment and quantities: One Huntair custom air handling unit (B090-AHU-1001); 66 Enviroco 4×4 ULPA fan-filter units (B090-FFU-1001 through B090-FFU-1066); one Greenheck relief fan (B090-RF-1001); one each of Marlo water softener (B090-WS-1001), carbon filter (B090-F-1001), reverse-osmosis system (B090-RO-1001), and duplex pump skid (B090-PB-1001); two Axeon EDI units (B090-EDI-1001); one 1,000-gallon PVDF tank (B090-T-1001); and specified humidification, access, drainage, and water-filter equipment detailed below. - Other named OEMs and basis-of-design vendors: Nortek Air Solutions, Stanley Access Technologies, Ahresty Corporation, Stonhard, MAPEI, PROSOCO, Ardex, Hilti, Simpson Strong-Tie, DEWALT, Powers, Larsen's Manufacturing Company, Welcome Ramp Systems, Kee Safety, DriSteem, Camfil, O'Keeffe, Watts, AWI Manufacturing, and 3M. The documents also identify LCP Tracker for electronic labor-compliance reporting. - Notable requirements: ISO cleanroom performance and contamination controls; coordination with existing electrical, chilled-water, fire-water, communications, data, and fire-alarm systems; integration with SLAC building controls; seismic support; cleanroom pressure and ESD grounding; testing, balancing, commissioning, and certification. Requirements also include California Class B contractor licensing, safety and quality programs, inspections, closeout records, and protection of the existing rail cavity support assembly. - Other specified services: Project management and scheduling, deferred fire-protection submittals, commissioning and training, a collaborative project-management information system with a complete non-proprietary data export, weekly electronic certified-payroll and labor-compliance reporting, and subcontractor safety qualification. - Schedule and value: The planning milestones indicate an overall period of roughly 15 months from anticipated award through final completion; the optional UPW scope is due within two months of notice to proceed. No contract amount is stated; the estimated value range is an analytical estimate.

Description

This Draft Request for Proposal (RFP) is a Sources Sought Notice to identify General Contractors (GC) who are capable of completing the planned construction of the Cryomodule Repair and Maintenance Facility (CRMF) Cleanroom and Ultra-Pure Water (UPW) System to support the future repairs to the LCLS-II and LCLS-II-HE cryomodules.

This is not a solicitation for proposal, and no award will be made from this Notice. SLAC intends to issue a formal solicitation later based on responses from this Source Sought Notice.

The site for the Cleanroom install will be inside the new CRMF building and is located North of the existing Linac Sector 11, along the North Access Road, adjacent the Sector 10 Adit Road located at the SLAC National Accelerator Laboratory, 2575 Sand Hill Rd, Menlo Park, CA 94025. This project is directly funded by the DOE's Office of Science.

The DRAFT RFP package attached consists of construction documents outlining the administrative and technical specifications and drawings pending approval by SLAC’s Building Inspection Office (BIO). The final documents will be used by construction subcontractors to assist in preparing a Firm Fixed Price Proposal.

PLANNED SCOPE AND DESCRIPTION OF SERVICES

Base Scope (Installation of Cleanroom)

The project scope includes installation of a new clean room inside an existing building, known as the Cryomodule Repair and Maintenance Facility (CRMF) building.  To accomplish this task, the following specific scope elements must be completed, with all deliverable items meeting requirements as defined in the SOW.  The Subcontractor is to fabricate the cleanroom per the SLAC approved design package generated by an A&E firm. The design package and Building Inspection Office (BIO) stamped print package will be supplied to the awarded Subcontractor.

Option 01 Scope (UPW System)

The project optional scope includes installation of a new ultra-pure water (UPW) system next to the cleanroom inside the CRMF building. 

SLAC National Accelerator Laboratory is seeking to award a fixed-price, turn-key construction subcontract to an experienced and highly qualified and skilled GC, to install the new Cleanroom inside the existing building, known as the Cryomodule Repair and Maintenance Facility (CRMF). The GC is required to install the new Cleanroom as detailed within the Statement of Work, Specifications, and Drawings. The GC is required to adhere to the project schedule, as outlined within the Statement of Work (SOW), while working in conjunction with SLAC to deliver the utmost safety, quality, and meet or surpass the administrative and technical requirements detailed in the Statement of Work, Specifications, and Drawings.

A turn-key Fixed Price construction subcontract will be awarded to the GC who provides the best value to SLAC based on the evaluation criteria.

The GC will finalize construction by performing the testing and commissioning of all new systems working with CRMF and SLAC Operations teams for a completed facility.

DRAFT REQUEST FOR PROPOSAL

SLAC will use a single step Best Value Trade Off selection method to identify the GC who provides the best value to SLAC based on the evaluation criteria.

The Draft RFP and relevant draft references are provided to present the general scope and acquisition method for the project. The draft documents provided are subject to change and should not be construed as a solicitation. This Sources Sought Notice is NOT A SOLICITATION but instead is to identify interested vendors for the upcoming formal solicitation release.

SOURCES SOUGHT RESPONSE

Interested GCs with the skills, capability, workload capability, and ability to obtain bonding to complete the planned project scope are invited to submit a written response to this Sources Sought Notice. Please provide the following information:

Company Name

Name, telephone number, and email addresses of your company point of contact(s) who have the authority and knowledge to clarify responses.

A statement of your company’s interest in receiving the formal solicitation notice and in submitting a responsive statement of qualifications.

Please provide your response to Jennifer Jamison at: jjamison@slac.stanford.edu by 5:00 pm PST on Friday, October 23, 2026.

SOURCES SOUGHT DISCLAIMER:

Please note that any responses to this Sources Sought posting is purely on a voluntary basis. SLAC is not requesting a proposal, any pricing, or any other information that could be considered confidential or proprietary to be submitted in response to this posting or any part of this posting. Any submissions that contain pricing, proprietary information, or confidential information will be discarded by SLAC.